Site Area Question

NC-v4.1 SSc5:Heat Island Reduction
posted by  Catherine Blakemore  on 

I noticed in the LEEDuser commentary that the credit calculations need to include parking outside the LEED project boundary.  Does this addition area get added to the area to of the LE

1
Tue Feb 11, 2020, 6:34 pm

Problem with the LED lamp

NC-v4.1 EAp2:Minimum Energy Performance
posted by  timmy lander  on 

There is a chandelier for four lamps - three in a circle and one in the center.

1
Fri Feb 14, 2020, 5:22 pm

Minimum IAQ performance LEED CI v4

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Donna Juselis  on 

Credit states "Monitoring Mechanically ventilated spaces For mechanically ventilated spaces (and for mixed-mode systems when the mechanical ventilation is activated), monitor outdoor air intake fl

2
Head of Energy & Environmental Management
EB Project Management | Green Building Consultants
LEEDuser Basic Member
14 thumbs up
Tue Feb 11, 2020, 8:40 am

Tenant Lease Agreement compliance path for glare control IEQc8.1

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  S. Sachs  on 

Has anyone used the Tenant Lease Agreement compliance path for glare control in LEED CS projects where the automated shades are being required by the developer but provided by the tenant?

3
Default Avatar
Principal
MEYERS+ Engineers
LEEDuser Premium Member
1 thumbs up
Mon Feb 10, 2020, 11:20 pm

Mandatory requirements for cement procurement w/ low embodied energy

SD Leaders
posted by  Andrée Iffrig  on 

Our firm was asked by a government client in Canada to update their specifications for concrete to capture low embodied carbon as a performance metric.

2
Director of Sustainable Design
LMN Architects
LEEDuser Basic Member
4 thumbs up
Mon Feb 10, 2020, 10:36 pm

Pre-consumer/post consumer Aluminum Recycled Content

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Trey Jones  on 

If the manufacturing process I am involved with consumes aluminum coil to produce our end product can we use the internal scrap percentage of the aluminum reused/reverted at the mill as either pre

4
Mon Feb 10, 2020, 10:03 pm

SSc4 - Special Site Strategies beyond LEED v4 criteria (Rainwater Management + Industrial waste-water considerations)

NC-v4 SSc4:Rainwater management
posted by  Olawale Taiwo  on 

PROJECTS THAT ARE PART OF A MULTI-TENANT COMPLEX ONLY
The credit requirements may be met using a coordinated approach affecting the defined project site that is within the

0
2
Mon Feb 10, 2020, 7:33 pm
1
Tue Feb 11, 2020, 4:27 pm