Forum quick links
Mechanical Ventilation in some areas of building
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I have the following doubt: Suppose that a building has an HVAC system designed for all office and working areas, but for the restrooms and locker rooms, which are occupied every shift (3 p
Meeting rooms requirements
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Brian Farrelly on
An office we are currently working on, is in a long narrow building resulting in 85% of the occupants being close to an operable window, however we have two meeting rooms.
Residential Bath Lavs
NC-2009 WEc3:Water Use Reductionposted by Jeremy Kuhre on
Does anyone have experience with using a 1 gpm aerator in a residential setting? We typically use 0.5 gpm aerators in commercial settings which has worked fine.
Avoidance of Chemicals of Concern Credit
posted by Anne Less on
Yikes! I spy what I hope is a MAJOR typo in this credit language.
Prerequisites in Master Site
posted by Omer Moltay on
We are using the campus approach for a mixed used development. None of the prerequisites will be applied under the master site.
Health Faucet
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Green BSL on
Hellow, Shall we consider Health Faucet provided in restroom for LEED CI Calculation in WEp1.0 & WEc1.0?
Building Envelope Compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Omar Delgado on
Greetings, We're doing a CI project where the glazing far surpasses the 40% wall area allowed on the north wall. However, the envelope will not be altered for this project.
Entry Way Systems: Floor mats
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Elle Brown on
I am working on a government project and half of our building is a garage space. 1. Do we have to put 10 ft long floor mats at each exterior door to the garage?
manufacturing plant: group certification or single structure?
posted by Jutta Berns on
i probably know the answer already, but i just want to test my understanding: we are in the process of registering a manufacturing plant (BD+C), which consists of an office building and a manufac
Energy Star Equipment and Timing
CI-2009 EAp2:Minimum Energy Performanceposted by Curt Pascoe on
I'm bringing up a topic discussed but not solved in previous comments. What does the USGBC include in "equipment installed as part of the tenant's scope of work"?