Mechanical Ventilation in some areas of building

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Hello, I have the following doubt: Suppose that a building has an HVAC system designed for all office and working areas, but for the restrooms and locker rooms, which are occupied every shift (3 p

8
Tue Mar 13, 2012, 12:46 pm

Meeting rooms requirements

CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Brian Farrelly  on 

An office we are currently working on, is in a long narrow building resulting in 85% of the occupants being close to an operable window, however we have two meeting rooms.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Tue Mar 13, 2012, 2:28 am

Residential Bath Lavs

NC-2009 WEc3:Water Use Reduction
posted by  Jeremy Kuhre  on 

Does anyone have experience with using a 1 gpm aerator in a residential setting? We typically use 0.5 gpm aerators in commercial settings which has worked fine.

2
Sustainability Coordinator
Webcor Builders
LEEDuser Basic Member
40 thumbs up
Mon Mar 12, 2012, 8:09 pm

Avoidance of Chemicals of Concern Credit

General forums
posted by  Anne Less  on 

Yikes! I spy what I hope is a MAJOR typo in this credit language.

3
Policy Director
Healthy Building Network
LEEDuser Basic Member
117 thumbs up
Fri Mar 9, 2012, 10:45 pm

Prerequisites in Master Site

LEED Guidance for Campuses and Multiple Buildings
posted by  Omer Moltay  on 

We are using the campus approach for a mixed used development. None of the prerequisites will be applied under the master site.

3
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Fri Mar 9, 2012, 10:42 pm

Health Faucet

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Green BSL  on 

Hellow, Shall we consider Health Faucet provided in restroom for LEED CI Calculation in WEp1.0 & WEc1.0?

3
Default Avatar
Blue Star Ltd
LEEDuser Basic Member
4 thumbs up
Fri Mar 9, 2012, 6:55 pm

Building Envelope Compliance

CI-2009 EAp2:Minimum Energy Performance
posted by  Omar Delgado  on 

Greetings, We're doing a CI project where the glazing far surpasses the 40% wall area allowed on the north wall. However, the envelope will not be altered for this project.

3
President
REAL Building Consultants
LEEDuser Premium Member
27 thumbs up
Thu Mar 8, 2012, 6:33 pm

Entry Way Systems: Floor mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Elle Brown  on 

I am working on a government project and half of our building is a garage space. 1. Do we have to put 10 ft long floor mats at each exterior door to the garage?

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Thu Mar 8, 2012, 2:42 pm

manufacturing plant: group certification or single structure?

LEED Guidance for Campuses and Multiple Buildings
posted by  Jutta Berns  on 

i probably know the answer already, but i just want to test my understanding: we are in the process of registering a manufacturing plant (BD+C), which consists of an office building and a manufac

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Thu Mar 8, 2012, 5:55 am

Energy Star Equipment and Timing

CI-2009 EAp2:Minimum Energy Performance
posted by  Curt Pascoe  on 

I'm bringing up a topic discussed but not solved in previous comments. What does the USGBC include in "equipment installed as part of the tenant's scope of work"?

5