Forum quick links
Comparison of Standards
posted by Sam Watters on
I'm trying to work through how much more efficient my project will be over ASHRAE 90.1 2007, and I wondered if anyone had experience with how the standard compares to IEC 2006.
LEED-ND 2012 - Stages and Expiration Policies
posted by Allison Wildman on
I am in the process of reviewing the LEED-ND 2012 redlines and have questions about the plight of the Stages and their associated expiration policies. Are the Stages being dropped entirely?
RESPONSIBLE EXTRACTION OF RAW MATERIALS
posted by Susann Geithner on
Distance in US vs Europe If a product meets the requirements for a responsible extracted raw material it will be weighted also by distance to the location in the way of being extracted within the
Ventilation rate in garage with local code
NC-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Strömberg on
Dear All, I have a further question about the ventilation rate. I am currently in a LEED project in Europe, which has a garage in the building.
Window Film Adhesive
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jessica Aubert on
We are working on a CI project which is bounded on three sides by a glass atrium space.
LEED certification for factories
posted by Mike Barker on
Rosamaria, in my humble opnion the key to it all is the intergration of the M&V plan and the energy modelling. You can use IPMVP to build baselines for anything.
Commissioning of Systems not required in prereq
NC-2009 EAc3:Enhanced Commissioningposted by Shauna Sproul on
Can points be achieved in innovation and design for commissioning of systems not required in prereq, for example the building envelope? I understand 2012 is addressing this, but what about 2009? I
CxA designation question
NC-2009 EAc3:Enhanced Commissioningposted by Blas Beristain on
Hello! We are involved in a project of a new headquarters of an architectural firm. In this project, the owner will be the architectural firm.
CxA Contract Question
NC-2009 EAc3:Enhanced Commissioningposted by Mark Haynie on
We hold a contract for construction of a project as the General Contractor. We also have contracted with the design firm (Architect) for the project.