Forum quick links
75% calculation for Residential projects:
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Chen Shalita on
We have NC student's campus, with 1700 Residential units.
Urinals in each restroom?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Marco Abdallah on
Assuming there are 2 separate male restrooms on each floor.
Ban the credit
posted by Bill Swanson on
If the politicians actually meant what they said then all they have to do is ban the GSA from letting any of their buildings to earn this Credit. Problem solved. But no.
Double Skin
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by breeze glazer on
Hello - I am working on an interiors project within a new tower, 1 Bligh St, in Australia. The tower features a double skin facade envelope system.
Template is rounding down to 0 daily uses!
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
I have a fixture usage group with 4 FTEs and there's a shower in it. Shower daily uses is 0.1, so the template calculates my total daly uses as 0.1 x 4 = 0.4 and it rounds down to 0.
Tenant requirements to achieve LEED Gold?
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Joseph Greene on
Is there an ID or EP point available in CS that would require a tenants to commit to LEED Gold?
Self-ballasted CFLs: additional luminaire wattage?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Zachary Goodnough on
In our project, we have installed a number of Edison base, screw-in CFL bulb, permanent fixtures.
Tenant Lease Agreement
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Curt Pascoe on
Any ideas why the Lease Agreement cannot be used for this prerequisite? Like others here, our building is an empty warehouse with no TI work.
No sorting possible
EBOM-2009 MRp2:Solid Waste Management Policyposted by Lise Dannesboe on
I have a project in a city, where there are no possibilities for sorting, as the municipality only gathers waste in one big chunk.