Forum quick links
Manufacturing Facility
NC-2009 EAc1:Optimize Energy Performanceposted by Summer Gorder on
What options in terms of compliance paths might one take when working with a manufacturing facility with high process loads?
Solar exposures and efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Rudolph Carneiro on
1) Is there an exception for small corner offices? The office is about 90 square feet. The 2 solar exposures are north and east facing. The office will have it's own dedicated split highwall.
Review Comments
NC-2009 EAp2:Minimum Energy Performanceposted by Emily Catacchio on
Maybe this is old news, but I just discovered it, so maybe others haven't yet.
IEQp1 Review Comments
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi, Could anyone help me, please? I have received a review comment from this pre-requisite, but I haven’t understood what they are asking for.
MPR point 6 - Option 2 - Approved Format
NC-2009 PIf1:Minimum Program Requirementsposted by Sustentator Argentina on
Does someone know what is the other approved format (not energy star) for uploading consumption information?
LEED for Schools, Multiple Buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Eric Bosley on
Hello All, I wanted to know if you have to use LEED Campus guidance for a LEED for schools project with multiple buildings.
Permanently-installed NOT compliant
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by SIG - Sustainability Main Account on
Based on comments on this forum, I assumed it was okay to permanently install walk-off material.
ASHRAE 90.1-2007 6.4.1.4 - Verification of Equipment Efficiences
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
There is a Brazilian HVAC manufacturer that has an centrifugal chiller with magnetic bearings equipment (air condensation).
COC Certification Required for GC...?
NC-2009 MRc7:Certified Woodposted by Adrienne Lynn on
We are a General Contractor and we are wondering if we, ourselves, would be required to get COC Certified when attempting to achieve MRc7? We purchase FSC plywood, dimensional lumber, etc.
Prerequisite IEQ 1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Caro Wilbanks on
For specification section 230593 Testing, Adjusting, and Balancing for HVAC the architect is asking for a Air Balance Report for Prerequisite IEQ 1: Documentation of work performed for ASHRAE 62.1,