Forum quick links
LEED v5 BD+C, WEc2 Enhanced Water Efficiency
NC-v5 WEc2:Enhanced Water Efficiencyposted by Dave Hubka on
Language in the reference guide states, "the calculations must include all restroom fixtures necessary to meet the occupant's needs (toilets, urinals, lavatories, and showers) when seeking LTc4: Tr
Has anyone received feedback for Path 1 - Develop a Standard Green Lease?
Pilot-Credits EApc159:Green Leases ACPposted by Mel K on
Development of efficient workflow for integrating material analysis
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Amanda Tullos on
Has anyone developed an efficient workflow for integrating material analysis early in design without significantly increasing project schedules?
Baseline pressure drop adjustments
NC-v4 EAp2:Minimum energy performanceposted by Boris Jonjic on
Hi all,
I've got a question about calculating the pressure drop adjustments for a baseline building. I'm using LEED v4, ASHRAE 90.1 2010.
LEED v4 Data Centers: Credit Potential for Non-Hazardous Water Treatment Skid
posted by Izba Ali on
Hi everyone, seeking feedback on the realistic total point yield across WE, EA, IN, and MR for an automated, pre-commissioned and non-hazardous process water treatment skid on a Data Center project
CxA Qualifications
NC-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Adam Bem on
Hello,
"Limited" Landscape Item Exception Question
Homes-v4 SSp2:No invasive plantsposted by Shakari McGill on
Hello,
Sample v5 IPM
EBOM-v5 EQc8:Integrated Pest Managementposted by Vanessa Nelson on
Does anyone have a sample v5 IPM Plan?