Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
5
Thu Jun 27, 2019, 3:29 pm

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6:Bicycle facilities
posted by  Marion THIBAULT  on 

Hi,

 

Do we have minimum requirements for the size and configuration of changing facility shower ?

 

Thanks
Marion

0

Core and shell building’s energy

CS-v4 EAc5:Renewable energy production
posted by  Devendra Chaughule  on 

Dear All,

We are doing a LEEDv4 CS project. For applying this credit, we need to engage 50%-100% (1-2 points) of total energy to be addressed by green power, REC and or offsets.

1
Thu Jun 27, 2019, 3:11 pm

Bye for Now

Green Commons
posted by  Julie Hendricks  on 

Dear Green Gurus,

13
Thu Jun 27, 2019, 12:27 am
3
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Jun 26, 2019, 8:54 pm

MRc6 & MRc7

NC-2009 MRc6:Rapidly Renewable Materials
posted by  Richard Metts  on 

Our team has asked the question if both MRc6 and MRc7 can both be entered together for credits.  The project has FSC certified wood throughout the project and for MRc6 the FSC Certified Wood m

5
CPC, LEED AP BD+C
Durotech, Inc.
LEEDuser Basic Member
3 thumbs up
Wed Jun 26, 2019, 3:49 pm

Is data-sharing letter needed from Owner?

CI-v4 EAc3:Advanced energy metering
posted by  Renee Shirey  on 

In LEED NC-v4 - EAc Building-Level Energy Metering a letter is required from the Owner to state their commitment to share energy consumption data.

1
Wed Jun 26, 2019, 2:48 pm