Topic | Recent |
---|---|
Single LEED building in Zoo: Demand Response Plan required for entire Zoo?NC-v4 EAc4: Demand responseposted by Joyce Kelly on Jul 31, 2024, 4:53 pm
Wondering if the... Last reply: Marcus Sheffer, Jul 31, 2024, 5:26 pm |
|
Reuse/ Salvage Materials for Option 2- Path 4NC-v4.1 MRc1: Building life-cycle impact reductionposted by Eslam Elshorbagy on Jul 30, 2024, 2:58 pm
Hi everyone, I would like to clarify the difference between... Last reply: Dave Hubka, Jul 31, 2024, 8:45 am |
|
Energy Star Commercial WasherNC-v4.1 WEp2: Indoor water use reductionposted by Michael Mantai on Nov 20, 2019, 6:32 pmI successfully followed this guidance and simply excluded larger washers: https://leeduser.buildinggreen.com/forum/industrial-washer-vs-commercial... I submitted a project for review (v4, not v4.1) a couple... Last reply: Emily Purcell, Jul 30, 2024, 5:30 pm |
|
Select Different Options for Multi-Tenant Buildings?EBOM-v4.1 MRc1: Purchasingposted by Kristina K on Jul 30, 2024, 2:12 pm
Hello, Can different options be selected under this credit if there are multiple tenants in the building? (i.e., one tenant complies with the electronic equipment option, the other... |
|
Composite wood- Compliance with CARB ATCM or TSCA Title VI is not enough?NC-v4.1 EQc2: Low-emitting materialsposted by Michael on Jul 8, 2024, 1:08 am
Hi LEED experts, My project used composite... Last reply: Kristi Ennis, Jul 29, 2024, 5:16 pm |
|
Social Equity within the Project Team (Option 1)Pilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Atlas Turner on Mar 17, 2023, 4:35 pmthe Forum button, I get an "Access Denied You are not authorized to access this page" message. Log in or register to post comments ... Last reply: Renee Shirey, Jul 29, 2024, 2:51 pm |
|
Including space in the the project boundary where only one trade is included in scopeCI-v4 MPR2: Must use reasonable LEED boundariesposted by Edgar Arevalo on Jul 29, 2024, 2:07 pm
I have an ID+C project that takes up approximately half of a floor in a building. When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it was... |
|
Waste-to-Energy ClarificationNC-v4 MRc5: Construction and demolition waste managementposted by Jenni Huynh on Dec 12, 2022, 10:58 am
Hi folks, I had inquired about... Last reply: Dave Hubka, Jul 29, 2024, 1:28 pm |
|
Air Curtains for a Fit-outRetail-CI-v4.1 MPR1: Must be in a permanent location on existing landposted by Dishant Khatri on Jul 29, 2024, 4:42 am
Hi, |
|
If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?NC-v4 MRp2: Construction and demolition waste management planningposted by Laura Stanley on Apr 15, 2021, 5:26 pm
Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020? I haven't had any luck finding info for this particular... Last reply: Dave Hubka, Jul 29, 2024, 8:10 am |