Single LEED building in Zoo: Demand Response Plan required for entire Zoo?

NC-v4 EAc4: Demand response
posted by Joyce Kelly on Jul 31, 2024, 4:53 pm

Wondering if the...

Last reply: Marcus Sheffer, Jul 31, 2024, 5:26 pm

Reuse/ Salvage Materials for Option 2- Path 4

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Eslam Elshorbagy on Jul 30, 2024, 2:58 pm

Hi everyone,

I would like to clarify the difference between...

Last reply: Dave Hubka, Jul 31, 2024, 8:45 am

Energy Star Commercial Washer

NC-v4.1 WEp2: Indoor water use reduction
posted by Michael Mantai on Nov 20, 2019, 6:32 pm

I successfully followed this guidance and simply excluded larger washers:  https://leeduser.buildinggreen.com/forum/industrial-washer-vs-commercial... I submitted a project for review (v4, not v4.1) a couple...

Last reply: Emily Purcell, Jul 30, 2024, 5:30 pm

Select Different Options for Multi-Tenant Buildings?

EBOM-v4.1 MRc1: Purchasing
posted by Kristina K on Jul 30, 2024, 2:12 pm

Hello,

Can different options be selected under this credit if there are multiple tenants in the building?

(i.e., one tenant complies with the electronic equipment option, the other...

Composite wood- Compliance with CARB ATCM or TSCA Title VI is not enough?

NC-v4.1 EQc2: Low-emitting materials
posted by Michael on Jul 8, 2024, 1:08 am

Hi LEED experts,

My project used composite...

Last reply: Kristi Ennis, Jul 29, 2024, 5:16 pm

Social Equity within the Project Team (Option 1)

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Atlas Turner on Mar 17, 2023, 4:35 pm

the Forum button, I get an "Access Denied You are not authorized to access this page" message. Log in or register to post comments ...

Last reply: Renee Shirey, Jul 29, 2024, 2:51 pm

Including space in the the project boundary where only one trade is included in scope

CI-v4 MPR2: Must use reasonable LEED boundaries
posted by Edgar Arevalo on Jul 29, 2024, 2:07 pm

I have an ID+C project that takes up approximately half of a floor in a building.  When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it was...

Waste-to-Energy Clarification

NC-v4 MRc5: Construction and demolition waste management
posted by Jenni Huynh on Dec 12, 2022, 10:58 am

Hi folks,

I had inquired about...

Last reply: Dave Hubka, Jul 29, 2024, 1:28 pm

Air Curtains for a Fit-out

Retail-CI-v4.1 MPR1: Must be in a permanent location on existing land
posted by Dishant Khatri on Jul 29, 2024, 4:42 am

Hi,
I am working on the LEED certification for a store whose interiors are revamped and the store is being prepared. Is putting vestibules or curtains mandatory under the LEED ID+C 4.1...

If sub-ing all NC-v4.1 for MR credits, then is NCv4-MRp2 still required if registered as v4?

NC-v4 MRp2: Construction and demolition waste management planning
posted by Laura Stanley on Apr 15, 2021, 5:26 pm

Has anyone encountered this situation, and been allowed to skip the MRp2 credit since it was omitted in NC-v4.1 in 11/2020?

I haven't had any luck finding info for this particular...

Last reply: Dave Hubka, Jul 29, 2024, 8:10 am