Complex Credit Definition

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Kristen Dotson  on 

I've clicked on all the links that have been posted in this blog in hopes of finding the list of "complex credits" but I haven't seen anything. The link on the GBCI website is broken.

3
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Tue Apr 8, 2014, 6:34 am

How can we get feedback on the pilot credit?

Pilot-Credits SSpc82:Local food production
posted by  Heather DeGrella  on 

I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 7, 2014, 11:03 pm

Fixture Replacement

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Patrick Salmon  on 

Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.

5
Mon Apr 7, 2014, 6:44 pm

LEED Interpretation 10372

NC-2009 MRc7:Certified Wood
posted by  Tristan Roberts  on 

I don't think the policy it gives is anything new—a lot of us have worked to choose to report wood content as either recycled or FSC, but not both—but FYI, LEED Interpretation 10372 was released on

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Mon Apr 7, 2014, 3:34 pm

LEED-NC or LEED-CI

LEED Rating System Selection
posted by  Samuel Nation  on 

We are renovating a large portion of a bldg on a University campus but there is a significant area of the building we are not touching at all. It was renovated a couple of years ago.

3
PE, LEED AP B D + C
DVPE
LEEDuser Basic Member
2 thumbs up
Mon Apr 7, 2014, 2:50 pm

Pressure Drop adustment in Section 14 Tables

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).

7
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Mon Apr 7, 2014, 2:31 pm

Option 3 Under LEED ND V4

ND-v2009 SLLc2:Brownfields redevelopment
posted by  Martine Desbois  on 

Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.

3
Fri Apr 4, 2014, 5:23 pm

Clarification on prescriptive option skylight/floor area ratio

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Jason Levine  on 

We are in the process of completing the spreadsheet for credit IEQ 8.1 for a NC project. Kalwall skylights are being used, in addition to Solatube 330 DS daylighting systems.

4
CEO, former USGBC Faculty
Innovative Design, Inc.
LEEDuser Basic Member
8 thumbs up
Fri Apr 4, 2014, 3:53 pm

LEEDBoundary 100%parking bassement Not all levels to be included

LEED Guidance for Campuses and Multiple Buildings
posted by  Gabriela Hernández Castillo  on 

CAMPUS: Two office towers designed to meet LEED Core & Shell with three parking bassement levels, the parking structure occupies the 100% of the site, in addition there is a residential tower t

3
Fri Apr 4, 2014, 12:50 pm

Spaces left for future use should be simulated as conditionned?

NC-2009 EAp2:Minimum Energy Performance
posted by  Valentin Grimaud  on 

Dear community, I have a project where some spaces will be left for future use, while most of others are designed and built for immediate use.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up