Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Glare Control - Glazing film

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Kristina Abrams  on 

Can a film be installed as a form of glare control for spaces with illuminance levels above 500fc?

3
Tue Apr 15, 2014, 5:27 pm

Documenting Diversion Quantities

NC-2009 MRc2:Construction Waste Management
posted by  Jennifer Kissinger  on 

We have an existing demolition project in which some of the concrete foundations/concrete slabs/block/brick debris can be taken to a recycling facility which will weigh each load, but some of the s

6
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Apr 14, 2014, 11:26 pm
4
Default Avatar
Director
ENERGYZEAL Smart Architecture & Sustainability Consulting
LEEDuser Basic Member
31 thumbs up
Mon Apr 14, 2014, 8:11 pm
2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Mon Apr 14, 2014, 3:29 pm

Low flow pre rinse spray valve in Europe

General forums
posted by  Charline SEYTIER  on 

EUROPE: Pre-rinse spray valve 1.6gpm or lower Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in

9
Mon Apr 14, 2014, 12:44 pm

One 62MZCalc for each AHU?

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Aurelie Simon  on 

Dear all, We have a 10-storey office building located in Germany with 1 AHU for each floor. Each AHU serves different zones (office, storage, kitchen etc.).

2
Mon Apr 14, 2014, 7:56 am

LEED Green Assoc. 2009 exam retake

General forums
posted by  Nadia Ayala  on 

Hi Tristan, You mention that "If you fail the LEED v2009 exam and do not schedule a retake before June 15, you will have to take the v4 exam". By scheduling the retake you mean the date in which

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Apr 13, 2014, 5:03 pm

Reasonale Proof that a measure is not Standard Practice

General forums
posted by  Erika Duran  on 

Anybody know where LEED obtained the definition of standard practice or non standard practice?

13
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Apr 12, 2014, 1:05 am

Production area calculation

Pilot-Credits SSpc82:Local food production
posted by  Danielle Ostafinski  on 

To demonstrate that at least one square foot per FTE is available for food production in a project with a greenhouse, should I use the square footage of the greenhouse space, or only the square foo

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Fri Apr 11, 2014, 6:46 pm

CI V3 - SS Credit 2 - Community Connectivity

General forums
posted by  Neil Rosen  on 

I am working on a CI project and have recently received a design review which has requested that I modify my credit submission for SS C2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Apr 11, 2014, 3:29 pm