Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Final Design Review - Language issue

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Gaston Michaud  on 

We just received the response of the final design review and the Enhanced Commissioning Credit was denied since the contract that describes the scope of work and the completion date is in Spanish.

9
Sun May 4, 2014, 4:13 am

Modeling buildings w/ no proposed cooling; Workaround?

NC-2009 EAc1:Optimize Energy Performance
posted by  Jason Chenard, PE  on 

On Sept 12, 2012 there was a thread: "Proposed model, CAV system without cooling system". It references a "high temperature set point work around".

3
Sr. Mechanical Engineer
Oak Point Associates
LEEDuser Basic Member
1 thumbs up
Sat May 3, 2014, 11:01 pm

intensive vs. extensive green roofs

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Davis Kantor  on 

My recent research shows that installing a green roof system on a project aimed at LEED certification has the potential to contribute to the following LEED credits: SS 5.1 Site Development - Prote

6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat May 3, 2014, 8:47 pm

Locker and Shower room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jackson .  on 

We working on a project that has shower and lockers room for their employees. does both area need to meet the prerequisite requirement in term of OA intake?

5
Fri May 2, 2014, 2:09 pm

ASHRAE 62.1 2007 locker room vs locker/dressing room

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

Hello. I'm confused with two items on table 6-4: "Locker/dressing rooms" and "Locker rooms". The later requires twice the exhaust rate of the first item.

3
Fri May 2, 2014, 1:52 pm

LEED for HealthCare 2009: International Projects

LEED Rating System Selection
posted by  Maya Karkour  on 

Hi All, Does someone know if LEED for HealthCare 2009 is available for International Projects? Thanks a lot,

4
Fri May 2, 2014, 8:16 am
6
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu May 1, 2014, 7:02 am

Material Cost - whats included .. whats not?

NC-2009 MRc5:Regional Materials
posted by  Jaida Anderson-Lozano  on 

The Reference Guide states "materials costs should account for all taxes and transportation costs incurred by the contractor but exclude any cost for labor and equipment once the material has been

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Apr 30, 2014, 10:33 pm

Using the "Offline Calculator" option on LEEDOnline

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maya Karkour  on 

Dear All, I am using the "Offline Calculator" option to upload the 62MZCalc on LEEDOnline. I noticed an input box requiring a narrative: "For projects using ASHRAE 62.1-2007, provide a narrative

5
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Wed Apr 30, 2014, 9:32 pm

We got a review from a

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marcio Alberto Casado Pereira  on 

We got a review from a Project and there are 2 comments that we are concerned about: 1) The review team says "that corridors, storage spaces, and technical rooms with intermitente occupancy would

9
Default Avatar
ZeroEnergy Design
LEEDuser Basic Member
0 thumbs up
Wed Apr 30, 2014, 7:21 pm