Final Design Review - Language issue
posted by Gaston Michaud on
We just received the response of the final design review and the Enhanced Commissioning Credit was denied since the contract that describes the scope of work and the completion date is in Spanish.
Modeling buildings w/ no proposed cooling; Workaround?
NC-2009 EAc1:Optimize Energy Performanceposted by Jason Chenard, PE on
On Sept 12, 2012 there was a thread: "Proposed model, CAV system without cooling system". It references a "high temperature set point work around".
intensive vs. extensive green roofs
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Davis Kantor on
My recent research shows that installing a green roof system on a project aimed at LEED certification has the potential to contribute to the following LEED credits: SS 5.1 Site Development - Prote
Locker and Shower room
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jackson . on
We working on a project that has shower and lockers room for their employees. does both area need to meet the prerequisite requirement in term of OA intake?
ASHRAE 62.1 2007 locker room vs locker/dressing room
NC-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Hello. I'm confused with two items on table 6-4: "Locker/dressing rooms" and "Locker rooms". The later requires twice the exhaust rate of the first item.
LEED for HealthCare 2009: International Projects
posted by Maya Karkour on
Hi All, Does someone know if LEED for HealthCare 2009 is available for International Projects? Thanks a lot,
Material Cost - whats included .. whats not?
NC-2009 MRc5:Regional Materialsposted by Jaida Anderson-Lozano on
The Reference Guide states "materials costs should account for all taxes and transportation costs incurred by the contractor but exclude any cost for labor and equipment once the material has been
Using the "Offline Calculator" option on LEEDOnline
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maya Karkour on
Dear All, I am using the "Offline Calculator" option to upload the 62MZCalc on LEEDOnline. I noticed an input box requiring a narrative: "For projects using ASHRAE 62.1-2007, provide a narrative
We got a review from a
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marcio Alberto Casado Pereira on
We got a review from a Project and there are 2 comments that we are concerned about: 1) The review team says "that corridors, storage spaces, and technical rooms with intermitente occupancy would