NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Nick Shaffer on
Is there an interpretation or language in the reference guide I am missing to support the statement above of "Is there a shortcut to the VOC budget method if you have just one product that is used
FTE calculation for gallery space
NC-2009 PIf3:Occupant and Usage Dataposted by Ilya Zavaleev on
I have a mixed used core and shell building with the following space types: - Retail - Office - Large gallery in the middle of the bulding which works as a main entrance to the large campus develop
IEQ 4.3 LEED Online Form Drop Down menu for adhesives
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Gina Dennis on
We are uploading to LEED Online using a Beta form "v.0.2.3" in the IEQ 4.3 Form. IEQ 4.3 requires us to list the adhesives (from IEQ 4.1) used for the flooring.
LEED project Management tool!
posted by Bahareh van Boekhold on
What are the good LEED project management tools or software for tracking and managing LEED certification projects?
Becomming LEED AP BD+C during LEED project
NC-2009 IDc2:LEED Accredited Professionalposted by Roger Moquin on
I, Is it ok for LEED IDc2 if i become LEED AP BD+C just before the start of the project or late in the project. I am the administrator of the project. Thank you.
Can a Graded Pad Site Meet SSp1?
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Michael Hoffner on
Our client has purchased a graded pad site from a developer and wants to build a LEED certified project.
Do you have to memorize credit names AND numbers?
posted by Elainna Wright on
Do you have you memorize the credit name associated with each credit number?
Smoking on balconies in residential and hospitality projects
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Heather DeGrella on
LEEDuser states that a project should ask itself "Will smoking be prohibited on all areas of balconies and decks, even for private residences and hotel rooms, that are within 25 feet of entries, o
Choosing an HVAC system baseline for a Manufacturing Facility
NC-2009 EAp2:Minimum Energy Performanceposted by Ashwin Kumar on
We are working on a manufacturing facility for which we are trying to choose the accurate HVAC baseline system for energy modelling. According to ASHRAE 90.1 2007 Table G.3.1.1A, looking at our co
Unoccupied Building
Data-Centers-NC-v4 MPR3:Must comply with project size requirementsposted by Phillip Cook on
I am working on a datacentre that does not include any occupied areas and will have no regular staff on site - security and network support will be provided from an adjoining site.