Forum quick links
Building Reuse of a previous LEED buiilding on same site
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Dan Milewski on
I have a question regarding compliance with this credit as long as MR Credit 1.2. Would this credit apply to a situation in which we are renovating (i.e.
Master Site and Campus Credits - LEED Boundary for Projects
posted by Donald Green on
The following was a post by K Kraft on Jan 2, 2014 that did not receive a response - I would like to ask the same question as well as an additional question as follows: Where does "normal support"
Performing Arts Building may have periodic smoking on stage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sara Greenwood on
Hello, I am working on a performing arts building that has a no-smoking policy for the interior and within 25' of the building.
Equivalents in Europe
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Mike D on
Has anyone ever used local equivalents instead of the Energy Star rating? ID#1492 states that we can use local equivalents.
Building with future additions connecting interior spaces
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by LEED Pro Consultant on
Hello all, We are working on an industrial facility with an adjacent office building that is looking for a NC certification LEED v2009.
Insulation and UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Sheryl Swartzle on
Would insulation be exempt from the "no added UF" requirement?
Article
posted by J. Yudelson on
I would take issue with Mr Phinney's implied estimate that you can do all the LEED consulting and meet all the requirements for less than $10,000 on a large project.
Different sources
CS-2009 MRc5:Regional Materialsposted by Mike D on
On one project we are working on, the manufactuer sources iron ore from many countries and he is unable to say what ore was used in any particular batch of steel. How do we determine this?
EA Pr-1, EB O&M
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Shelendra Kumar on
Hi, my concern is about EA Pr-1, our Energy Score is of 86 (based on performance perios, 12 months data) where minimum required is 75. A furtehr clarification asked about target index i.e.