Precertification Final Decision
posted by Tracy Baker on
We received our Precertification Final Decision for our Core and Shell building. LEED online indicates I can accept or appeal the final decision.
Simulations for EAp2
NC-2009 EAp2:Minimum Energy Performanceposted by Keerthi Ratnayake on
Hello Marcus, Can we consider the savings from renewable energy (solar pv) in the energy simulation? We do not have the minimum 10% without renewable energy. KC
Excellent
posted by Kathryn West on
This should result in a better LEED experience. I also wonder who is answering these emails though and what the communication is between the person answering and the LEED reviewers.
Location Valuation Factor Question
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Lorne Mlotek on
The reference guide states that, "Products and materials that do not meet the location radius but do meet at least one of the sustainability criteria are valued 100% of their cost (i.e., the valuat
Weighted Average of Renovated and Addition energy saving targets
NC-2009 EAp2:Minimum Energy Performanceposted by Emmanuel Miranda on
Hello, I've searched the forum but haven't found a definite answer.
Modeling infiltration in the baseline case for an existing bldg?
NC-2009 EAp2:Minimum Energy Performanceposted by on
I put this comment in a reply below, but I'm afraid it wont be seen, so I'm starting a new thread... We are renovating an existing historic building which included window replacements, furring out
Baseline hvac system for data center
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
I'm trying to do my first model for a data center and looking at the table in appendix g of ashrae 90.1.2010 for the hvac system that I have to follow for the baseline model I can't understand if t
Energy Modeling Procedure for a Data Center
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Santiago Rodriguez on
We are working on a project that is seeking the LEED NC 2009 Certification.
Determining Option 1 or Option 2
CI-2009 EAc3:Measurement and Verificationposted by Michelle Rosenberger on
Our specific LEED CI project is definitely less than 75% of the building. But our client for the CI we are pursuing occupies the whole building.
Rational Method
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by MKK LEED on
Good Morning, I’m starting with calculations in SS credit 6.1. But I have a question: Can I use the runoff data of the watershed where is located the project?