Forum quick links
Dust control
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Lawrence Lile on
What are the common measures used for dust control? SWPP plans I see around here always deal with soil erosion, but dust control is commonly ignored by inspectors and on most construction sites.
Land Trusts and Land Use Restriction Agreements
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Colin Twohig on
We have a project that is going for LEED Core and Sheel v2009 certification in a densely populated urban area and needs to pursue some form of contractual interaction with a land trust in order to
SSc 3.3 Parking Availbility
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jaclyn Noga on
There is no parking space available around the building, will that be satisfied for Exemplary Performance under the Version 3 rating system?
Submitting documents on LEED online for EAc4
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Mridul Sarkar on
Hi In a preliminary design review for our project, the reviewer has asked us to provide supplementary calculations to show the credit compliane.
Using 5% of Total Parking Slots instead of 5% of FTE
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Katherine Ann Resurreccion on
Similar to the situations below. We are certifying only the 7F of a building (294 FTE) under LEED CI v2009 and according to this credit we need to provide 15 slots fro carpools.
Two parking clarifications
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jared Silliker on
1.
Difference VOC emissions - VOC content (adhesives and sealants)
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Tom Peeters on
I'm having difficulties to understand the difference between the VOC emission requirements and the VOC content requirements as stated in the LEED-draft.
FTE Calculation
posted by Sriram Gopal on
Hi, I have a slight confusion in calculating FTE to monitor energy consumption. Example. Totally 500 people. 200 people are working in two projects general shift of 8 hrs. The remaining 300 are
How to interpret "Huddle Rooms"?
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Brian Salazar on
Hello - We are in the process of certifying an interior fit-up which utilizes a number of small "huddle rooms" which are enclosed spaces roughly the size of a private office, but furnished with occ
Alternative Compliance Path Outside the US
CI-2009 MRc5:Regional Materialsposted by Katherine Ann Resurreccion on
Hi I am currently handling a LEED CI project in the Phillipines. Apparantly I have encountered an addenda Stating an Alternative Compliance Path Outside the US for LEED CI.