Daylight for CS v2.0
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Citlali Mora Bello on
Hello, we are working on a project that will be submitted under the C&S v2.0 Do you know if we must still meet the 25 fc criteria, before the 2012 addenda? And we also have reception areas wh
Sample Submittals
Pilot-Credits EQpc78:Design for active occupantsposted by Claudia Galvis on
We found this credit as a very appropriate way to keep our project's future occupants active (our project is a fire station) in addition to the Owner project requirements to promote exercise in the
Groos Square Footage
NC-2009 PIf2:Project Summary Detailsposted by Jessica Garcia on
I have a project with a parking lot in the basement and 1 level of construction, for the Pl Form 2 I need to indicate new construction square footage, total gross square footage, and footprint of b
Airflow measurement devices in manufacturing facility
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by LEED Pro Consultant on
Hello, We are working on a project which is an industrial plant, the building will be mechanically ventilated.
Peak occupants and FTEs
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jean-Baptiste Noel on
Hi all, For our project, we have 3 shifts of 8 hours each. For the first shift, there are 600 occupants, and for the 2 other shifts, there are 300 occupants.
Net metering with one meter or two
NC-2009 EAc2:On-Site Renewable Energyposted by Brian Leet on
Marcus, Our project is a campus which is pursuing a PPA.
Required Water Heater efficiencies and Standby Losses
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I'm having trouble interpreting Table 7.8 in 90.1-2007. The way the performance requirements are listed is confusing, especially for gas water heaters, but I'll get to that in a bit.
Beach Cleanup of Trash - credit?
EBOM-2009 MRp2:Solid Waste Management Policyposted by Nate Gillette on
All - our client goes out to the beach monthly and does a cleanup. It's mostly trash, including some not so nice items that you don't want to touch without gloves.
IPM - vendor not yet in place
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Robert Cannellos on
Our project is implementing an IPM plan for the building but the vendor will not be identified until after construction is complete. We are preparing to submit for Design review.
lab sink, kitchenette sink and shower water calculation rate
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by ebru unver on
We are working on NC Office Building Project. The building has 6 lab sinks, 3 kitchenette sinks and 9 showers (for guests, will be used maybe ones a week). Should we include to the calculation? Ho