Forum quick links
Water-Jet Marble Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Omar Elrawy on
Dear all, I have a custom shaped (curved) marble flooring, the marble is mineral based, but the supplier will be cutting the marble shapes at his factory, and will be adhering curved p
Hi, We are working on a
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Neetika Parmar on
Hi, We are working on a refinery located in a remote/restricted area and hence there is no public bus access within 1/4 mile of the project.
Hi !
Are 10 basic services
NC-2009 SSc2:Development Density and Community Connectivityposted by Neetika Parmar on
Hi ! Are 10 basic services limited to only those mentioned in LEED NC 2009 or can we include other services to target credit for community connectivity ??
ASHRAE definition of "kitchenette"
NC-2009 IEQp1:Minimum IAQ Performanceposted by Ritwik Kakati on
Does anyone know how ASHRAE defines a "kitchenette" from a regular kitchen? I am trying to determine which value I should use from Table 6-4 of 62.1-2007.
LEED-CS potential ID credits
CS-2009 IDc1:Innovation in Designposted by Angela Mai on
I have a commercial client who is the owner of a new-construction, multi-tenant building entering the final review phase of LEED-CS. I have a few questions about potential ID credits: 1.
Service Bay Entries
Pilot-Credits PC14:Walkable Streetsposted by Anthony Bandy-Zalatoris on
The architect of our project created a design where there is no "back" of the building - the street-side elevation is nearly identical to the rear (parking lot and service side).
Recycling Facility Letters of Certification
NC-2009 MRc2:Construction Waste Managementposted by John Covello on
I have a question about doing an overseas project. Do we need some kind of Letters of Certification for the recycling facilities we are using?
Pre-existing Campus PV Array - Does commissioning apply?
NC-2009 EAc2:On-Site Renewable Energyposted by Heather DeGrella on
If we are allocating production from a campus PV array, in which the array is already built and outside of our LEED boundary, how do commissioning requirements apply?
Appeal Process
posted by Dennis Park on
Can we appeal multiple times for different credits? If so, are there time limits between the appeals? I ask because we have different paths we've routed to achieve our end goal.
stormwater when site is directly on the river?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Carrie Laurendine on
site is on the river. I assume this doesn't change anything, but civil engineer asked I check to see if LEED has exceptions for this.