NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Roberto Meza on
In one of our projects (a bank branch) we have 4 parking spaces out of parking lot, only for employees, these 4 spaces are separated of the parking lot by a gate and they are not available for the
Is this project a CS project?
posted by Lise Dannesboe on
We are wondering if our building can be certified with CS: The building is a renovation project in which a developer is fundamentally refurbishing the building base systems and building shell. The
Installing CO2 devices in non-densely occupied spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Marina Andrade on
To comply if the requirements of this credit, could we installed CO2 devices, instead of outdoor airflow mesurement device, in non-densely occupied spaces?
"Preferred" Parking = reserved, cannot be used by others?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eric Thompson on
I have a project where we only have 3 parking spaces provided, resulting in a substantial reduction from the baseline. However, the client is reluctant to reserve these exclusively for carpools/va
Low-temperature chemical dishwashers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Susan Di Giulio on
The kitchen consultant on our project has specified a Hobart LT-1 LOW-TEMP CHEMICAL DISHWASHER. While most Hobart products are E-Star, this one is not.
DES Option 2 – CHP with absorption chiller
NC-2009 EAc1:Optimize Energy Performanceposted by Qian Tang on
Hello, We are working on a LEED NC 2009 project with DES which the thermal plants consist except boilers and electric chillers also a cogenerator and an absorption chiller. We are thinking to follo
Footprint, at grade or below grade?
NC-2009 PIf2:Project Summary Detailsposted by Maria Porter on
Hi! I have a question similar to the one posted on Nov 18 2013 below.
Distributors location for MR c5
NC-2009 MRc5:Regional Materialsposted by María Fernanda Aguirre on
Hi there! Regarding regional materials do distributors facilities need to be counted within the 500 miles radius?.
When can construction review start for a NC project
posted by Pia Öhrling on
How much of the building must be ready before you can send in constuction review?