Pressure loss calculation
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Yaser Al Sharif on
We are registed for commercial interior rating system , the system installed in our project is vrv system, in order to comply with optimize energy performance EAC1.3 , critical path supply duct pre
FSC Certified Plywood
NC-2009 MRc7:Certified Woodposted by Andy Prestridge on
I have a lot of plywood that is being used on the job that is supposed to be FSC Certified.
Energy Modeling In a High bay Industrial area + Office
NC-2009 EAp2:Minimum Energy Performanceposted by Marcelo Maciel de Santa Helena on
What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.
MRpc69 - easily achieved, but not always
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Laura Charlier on
We registered for this credit for one than one project under the thought that it would be easy to achieve. We were right...for one of the projects.
Sediment Basin dimensioning
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hi, this may be a silly question. When dimensioning a temporary sediment basin, the CGP says to use either the calculations for the 24 hs- 2 year desing storm or 3600 cubic feet x acre drained.
Performance period timing
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Kim Wajda on
If performance periods for different credits have to end within the same 30 day period, and our solid waste was hauled and tracked during the period of the project's additions and alterations, this
Building Facade lighting - ASHRAE Baseline values
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I'm looking at Table 9.4.5 of ASHRAE 90.1-2007 which lists the maximum allowable LPDs for building exteriors.
Furniture Cost
CI-2009 MRc5:Regional Materialsposted by Morteza Kasmaei on
In a LEED-CI project, can we attempt for MRc4, MRc5, and MRc7 but not included cost of furniture in the calculator? It means that the furniture is not included in any of the LEED-CI credits.
Semi-permanent streams
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .
documentation guidance updated
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Tristan Roberts on
LEEDuser has had a lot of comments from you that documenting this credit was confusing, particularly when environmental practices aren't employed 100% of our time.