Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

If the ventilation of kitchens in hotel should be included in

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Leanne Niu  on 

A hotel project that the kitchens have independent ventilation and outdoor air system , whether the ventilation of kitchens should be included in the calculation?

2
Tue Apr 28, 2015, 1:28 am

VOC content for Shop applied finishes

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by   Jeremy Mendenhall  on 

We are new to the Leed program and wanting to make sure that we are following all of the guidelines, we have received some instruction however I'm trying to get confirmation that shop applied fini

4
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Apr 27, 2015, 10:37 pm

Commingled Waste Diversion

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Michelle Rosenberger  on 

I see nothing in this credit that discusses commingled diversion methodologies or requires monthly diversion rate backup from facilities like the NC rating system.

4
Founder & CEO, LEED Fellow, BREEAM Fellow
BuildingWise LLC
LEEDuser Expert
224 thumbs up
Mon Apr 27, 2015, 10:32 pm

Floor Coating that Exceeds VOC Limit

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Amanda Atkinson  on 

We have two CS v2009 projects in which a single epoxy floor coating exceeds the allowed VOC content. All other flooring products and coatings are compliant.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Apr 27, 2015, 8:32 pm

Uploads and deleting uploads - is the webinar posted somewhere?

General forums
posted by  Susan Di Giulio  on 

I watched the webinar on how to use the new site on January 5, and I have been to the uploads page for the project in question but I can't remember how to upload docs and how to delete previously u

4
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Mon Apr 27, 2015, 8:10 pm

What if only 2 of 3 stairwells meet daylighting requirement?

Pilot-Credits EQpc78:Design for active occupants
posted by  Steve Loppnow  on 

In a multi-family project, we have 2 of 3 stairwells that meet the daylighting requirement. Would we still be able to claim credit for the daylighting option, as 1 of our 7 features?

4
Default Avatar
Sustainability Consultant
Steven Winter Associates
LEEDuser Basic Member
2 thumbs up
Mon Apr 27, 2015, 7:19 pm

Option 2 for submetered irrigation

EBOM-v4 WEc1:Outdoor water use reduction
posted by  Charalampos Giannikopoulos  on 

If we install subsystem metering for the irrigation systems to comply with WE credit Water Metering can we still select Option 2 (No irrigation meter installed: Calculated water budget).

2
Sustainability Advisor
Transwestern Sustainability Services
LEEDuser Basic Member
12 thumbs up
Mon Apr 27, 2015, 4:59 pm

LEED CI or not?

LEED Rating System Selection
posted by  Melissa Merryweather  on 

GBCI staff have just informed a colleague that his project can be certified CI.

7
Sat Apr 25, 2015, 9:42 am

Occupant Comfort Survey - draft from LEED User

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Oana Stamatin  on 

We used with success in the past the Template for Occupant Comfort Survey from Resources tab, but for our fifth project the following GBCI comment was received: "The survey does not appear to addre

3
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Apr 24, 2015, 8:42 pm

VOC Budget shortcut?

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Rick Farrell  on 

We are a wood floor contractor who often does site finished wood floors on commercial LEED projects, mostly in Texas. The water based urethane we use states the following on the MSDS VOLATILE ORGAN

3
Architect & Design Consultant
Woodwright Hardwood Floors
LEEDuser Basic Member
7 thumbs up
Fri Apr 24, 2015, 12:00 am