Forum quick links
HVAC system wasn't running during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Juanita Garcia on
If the HVAC system wasn't running during construction of a new building, what is the requirement for documentation? We have dated checklists documenting that the HVAC system wasn't running and that
Exterior Shading Devices
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Sara Zoumbaris on
Hello LEED Users, I am working on a project with a majority of the exterior being composed of aluminum curtain wall.
Partially Occupied Warehouse
NC-2009 IEQp1:Minimum IAQ Performanceposted by Annalise Reichert on
I am working on a project that has a 45,000 SF unconditioned warehouse and utilizes natural ventilation.
G3.1.1 Exception a
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I have a convention center project where it has a exhibit hall with high process load. It is larger than 20k ft2.
Reserved parking on existingcampus parking area outside building
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by LEEDme Lorenzi on
We have a new office project inside a campus, there is an existing big parking area serving the campus not adiacent to the building, no parking are allocated inside our LEED boundary and not new pa
Stormwater inspection
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Charalampos Giannikopoulos on
Both uploads SSc6-3 and SSc6-4 require the provision of “a copy of the most recent stormwater inspection and a log showing that any needed maintenance or repairs were performed within 60 days of th
Energy recovery from a nearby data center?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that is planning to use energy recovery from a nearby data center. The rest of the heat and cooling are provided by a district plant.
Fume hood exhaust fan process load?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I think fume hood exhaust are unregulated in 90.1 2007 thus should be process load. But just want to confirm. I do see EPAct 2005 says fume hood should not be treated as process load...
Basline system for 5 floors + small below grade conditioned spac
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
What is in your opinion the baseline for the following building: Floor area:12,000 sqm (130,000 sqft) Floors: 5 above grade, mostly conditioned.
Pre-development Conditions
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Leandro Silva on
Greetings Our project is a 30 year old building undergoing a Major Renovation and will be registered as LEED-NC v2009. In calculating pre- and post-development runoff, do we consider the pre-develo