Forum quick links
Rating System Selection CI
posted by Christian Bösselmann on
Dear all I am hesitating whether the following project could obtain a CI certificate for the entire building: -existing office building -one entity owns the entire building -interior works will be
Square Footage for the Decorative Lighting Allowance
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Christopher Shaw on
When you claim a lighting allowance for Decorative appearance you get 1 watt/sf.
Professional Engineer
EBOM-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
To comply with the prerequisite is it essential to engage a Professional Engineer if the project is located outside the U.S. and consequently ineligible for Energy Star certification?
Cooling only space and system type 2
NC-2009 EAp2:Minimum Energy Performanceposted by Laura Brandt on
I have a dormitory project which has a few cooling only spaces.
EAp2/EAc1, 1 pt denied, therefore, incorrect kWh - what to do?
NC-2009 EAc6:Green powerposted by Peg Manuel on
Using Option 1.
Double the Pleasure???
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Molly Jones on
So...if we participate in this pilot credit (option 1) AND we already comply with LEED-NC 2009 WEc2, is it safe to assume that we will be awarded 2 points under the LEED-NC 2009 WEc2 AND 1 ID point
LEED GA v4 exam
posted by Monica Pinjani on
Hi Everyone I intent to take the Green GA exam this October. Was initially planning to take the 2009 format exam but due to personal reasons couldn't take it before June 15.
FTE in a healthcare outpatient facility
NC-2009 PIf3:Occupant and Usage Dataposted by Elise LaPaglia on
I am working on a LEED-NC project that is primarily an outpatient facility but has some future shell spaces for Retail and some for future expansion of the outpatient facilities.
Pilot credits
EBOM-v4 INc1:Innovationposted by Charalampos Giannikopoulos on
Is there any particular reason for which a Pilot credit from the general EBOM rating system such as the "Design for active occupants" credit would not be accepted for LEED v4 O+M - Data Centers?
EnergyPro for Whole Building Energy Simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
We have a project in which they are attempting to use EnergyPro to show compliance for credits EAp2 and EAc1.