Forum quick links
free waste heat from outside of LEED project for heating
NC-2009 EAc1:Optimize Energy Performanceposted by Mónika Egyed on
Our project is a small office building in Europe, on site of a great industrial plant with the same owner. The office building aims to achieve LEED Gold certification, while the plant does not.
Carbon Offsets (Green-e Equivalent)
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Henrique Mendes on
We have a client that wants to buy carbon credits from a project in Brazil, and since green-e do not have auditors here, there are no Brazilian companies certified under the Green-e climate standar
Several separate baseline HVAC systems on one floor.
NC-2009 EAp2:Minimum Energy Performanceposted by Nina Starynina on
Hello colleagues, I have a question from our energy modelling team. The question is about baseline HVAC systems modelling.
Transit Service Tables
ND-v2009 PIf3:Project Location and Base Mappingposted by Michael Smithing on
Where can I find the Transit Service Tables that are referred to on the form?
Ventilation for parking garage
NC-2009 IEQp1:Minimum IAQ Performanceposted by FABIO VIERO on
Hi All, I have a question about a project under LEED certification. We are designing the ventilation of one floor below-grade parking garage, situated below an open area adjacent to an office bui
LEED-NC or LEED for Homes (and v3 vs v4)?
posted by emily reese moody on
Hello, I've tried calling USGBC, who told me to email certinfo@usgbc.org. I did that a little over 2 weeks ago, and have yet to get a response.
Combining Option 1 and Option 2
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lyle Axelarris on
Has anyone had any experience combining the approaches in Option 1 and Option 2 to achieve this credit? We plan to use economizer cooling for most of our cooling needs.
How does the formula work with mixed new and existing projects?
CS-2009 EAc1:Optimize Energy Performanceposted by Charles Nepps on
Our project building is 75% existing and 25% new construction. When the credit form calculates the EAc1 points, it is done based on a weighted average, which makes sense.
Lease Language Mandate for Fixture Flow Rate Thresholds
CS-2009 WEc3:Water Use Reductionposted by Jay Murray on
Similar to Diego's comment, we actually have two buildings where we are installing the plumbing infrastructure as part of the Core and Shell scope, but not the acxtual fixtures.
calculator v06
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by M. Galvao on
Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t