Forum quick links
How to deal with a hotel.
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Susan Di Giulio on
Others have asked this before and not gotten an answer so I'm taking another shot. Can someone please verify this approach?
Gym Floor Paints
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Shelley White on
Does anyone know if the graphic arts coating VOC limit of 500 g/L used for Game Line paints is acceptable or do game line paints have to comply with the 150 g/L limit effective 1/1/14?
Checklist states 2 points possible
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Parker williams on
Are you allowed to do both options for this credit? 2 points possible or 1?
Crade to Gate or Cradle to Grave
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Christine Richey on
The company I work for is just in the beginning stages of creating a type III EPD for our engineered wood products.
FSC Mix cabinet with Recycled content
NC-2009 MRc7:Certified Woodposted by Indochine Engineering VN on
Hi, one kitchen supplier showed me their CoC certificate that says the status of material is FSC Mix and they also confirmed their cabinet products have 25% recycled content.
Light meter phone apps
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ben Thompson on
Hi all, I'm going to do the measurement method for the first time, and was looking into using a light meter app on my phone to do it- would this be acceptable?
Scope of the credit
posted by Frantisek Macholda on
Hello, I am not sure if this credit covers the equipment purchased for building management purposes only (i.e.
Alternatives for Option 1. material ingredient reporting
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jane Wigren on
For Projects outside of the United States using national systems for creating a complete Product content inventory (e.g.
Space Usage - Occupant Type
NC-2009 PIf3:Occupant and Usage Dataposted by Akshat Patel on
I'm having trouble deciding what to mark for the first item in the form: Occupant Type. My project is a hotel new construction.
Runoff rate and runoff volume definition
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Noriko Nagazumi on
Michael, Our local regulations usually require rainwater collection facilities that only shift the total runoff between storms instead of infiltrating or reusing the rainwater. Is there a common