Topic | Recent |
---|---|
Retention Pond = zero potable water usage?EBOM-2009 WEc3: Water Efficient Landscapingposted by Paul C on Sep 13, 2010, 3:11 pm
Our project site has man-made on-site ponds which we use for irrigation and any run-off goes back into the ponds so we do not use any city potable water supply. Would the ponds be considered a... Last reply: Tristan Roberts, Oct 15, 2010, 4:51 pm |
|
Refrigerant Phase Out FeasibilityNC-2009 EAp3: Fundamental Refrigerant Managementposted by Michael Tillou on Oct 5, 2010, 12:19 pm
We are designing a building for a client that will use purchased steam and chilled water from a local central plant. The central plant still has R-11 chillers and we advised them they needed a... Last reply: Shillpa Singh, Oct 15, 2010, 4:36 pm |
|
Certification PeriodCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by Lori Selcer on Oct 14, 2010, 4:40 pm
The EQ4.5 template form requires that the "Test Date or Certification Period" be supplied. the Greenguard Certificate of Compliance provides a period range of compliance, not a single date. the... Last reply: Tristan Roberts, Oct 15, 2010, 6:36 am |
|
Regarding Performance Period for LEED O+M (EB)EBOM-2009 EAc1: Optimize Energy Efficiency Performanceposted by Ramesh Narayanan on Oct 13, 2010, 11:52 pm
Hi Friends, Last reply: Tristan Roberts, Oct 15, 2010, 6:34 am |
|
Registering to P9Pilot-Credits PC9: Street Networkposted by Simon Sue on Oct 13, 2010, 6:47 am
Hi, Last reply: Tristan Roberts, Oct 15, 2010, 6:04 am |
|
Advanced Energy Design GUide for Small Hospitals- 50%NC-2009 EAc1: Optimize Energy Performanceposted by Margaret Montgomery on Oct 13, 2010, 2:22 pm
THere's a new ASHRAE guide for small hospitals and healthcare facilities with prescriptive guidance for 50% energy reduction. I see that AEDG healthcare hasn't been included in the list of... Last reply: Margaret Montgomery, Oct 14, 2010, 6:51 pm |
|
Calucation QuestionEBOM-2009 SSc6: Stormwater Quantity Controlposted by Nell Boyle on Oct 1, 2010, 11:50 am
Can you please tell me what the difference is between the percentage listed as "Percentage of storm rainfall volume mitigated" and the second percentage "Design storm rainfall mitagted" ? Last reply: Amy Rider, Oct 14, 2010, 6:26 pm |
|
M&V For Industrial FacilitiesNC-2009 EAc5: Measurement and Verificationposted by Mary Frances Stotler on Oct 14, 2010, 11:31 am
We're designing a food processing plant that will have systems in place to monitor the overall loads of the entire building. The drives read the information from all MCCs and determine the... Last reply: Marcus Sheffer, Oct 14, 2010, 12:07 pm |
|
Outdoor air flow and primary supply air flowSchools-2009 IEQp1: Minimum indoor air quality performanceposted by Maya Karkour on Oct 11, 2010, 7:51 am
Dear all, I have a... Last reply: Roger Chang, Oct 14, 2010, 8:31 am |
|
Change in WEc4 in LEED 3.0 vs. 2.0/2.2Schools-2009 WEc4: Process water use reductionposted by Suzanne Painter-Supplee, LEED AP+ID&C on Aug 20, 2010, 1:11 pm
I see that there is a subtle change in WEc4 in LEED v3.0 over v2.2 that has some of my food service consultant clients very concerned. And with good reason because their kitchen's performance can... Last reply: Suzanne Painter-Supplee, LEED AP+ID&C, Oct 14, 2010, 12:56 am |