Topic | Recent |
---|---|
Modeling targets and after M&VNC-2009 EAc1: Optimize Energy Performanceposted by Ned Halling on Oct 12, 2010, 12:50 pm
We would like our proposed model to meet a minimum of 30% increased energy performance. After modeling, the potential increase is 44%. Is it possible to submit the credit showing a 30% increase... Last reply: Marcus Sheffer, Oct 16, 2010, 10:04 am |
|
Is Acacia tress a rapid renewable material?CI-2009 MRc6: Rapidly Renewable Materialsposted by Simon Sue on Oct 15, 2010, 6:39 am
i get to know from my supplier that their product was made from Acacia trees and it will growth to maturity below 10 years. i try to check on USGBC or EPA list of renewable resouces material and... Last reply: Simon Sue, Oct 15, 2010, 11:31 pm |
|
LEED Boundary and Non-contiguos staging areaNC-2009 SSc5.1: Site development - protect or restore habitatposted by Nina Bradstreet on Oct 6, 2010, 4:43 pm
I am working on a v3 NC project being built on a site with an abundance of native vegetation. As a result of the presence of all the vegetation we are trying to preserve, we have to move our... Last reply: Tristan Roberts, Oct 15, 2010, 11:07 pm |
|
GID+C Credit on NC Project- Innovation in Design Credit Point?NC-2009 IDc1: Innovation in Designposted by Sara LeMone on Oct 13, 2010, 9:58 am
If a project performs and complies with all requirements of ID IEQc4.5 Low-Emitting Materials--... Last reply: Tristan Roberts, Oct 15, 2010, 11:04 pm |
|
SRI value for an existing copper roofNC-2009 SSc7.2: Heat island effect - roofposted by Bill Swanson on Jan 14, 2010, 4:09 pm
In response to an earlier thread on... Last reply: Tristan Roberts, Oct 15, 2010, 11:02 pm |
|
Total Site Area- LEED Boundary or Property Line?NC-2009 SSc5.1: Site development - protect or restore habitatposted by Peter Wurst on Oct 14, 2010, 8:12 pm
We are renovating an existing building, providing a large footprint of new construction, and have designated the LEED boundary for our project to include all site that has been disturbed or... Last reply: Tristan Roberts, Oct 15, 2010, 10:57 pm |
|
Day Care in LEED-NC 2.2NC-2009 WEp1: Water Use Reductionposted by sara theodore on Oct 15, 2010, 10:27 am
I have a daycare facility with children from 0 yrs old to preschool age with one classroom for after school kids which I assume is older children. Realistically, I’d say all the children would... Last reply: Tristan Roberts, Oct 15, 2010, 10:45 pm |
|
SMACNA guidelinesEBOM-2009 IEQc1.5: Indoor air quality best management practices - indoor air quality management for facility additions and alterationsposted by Jutta Berns on Oct 12, 2010, 8:45 am
do draft the... Last reply: Allison Beer McKenzie, Oct 15, 2010, 10:38 pm |
|
meter owned by building owner or utilityEBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by Rachael McClain on Oct 12, 2010, 12:55 pm
I was wondering if someone could clarify something for me. We have a situation where we need to submeter our builidng because it currently shares a meter with other buildings. The reference... Last reply: Jenny Carney, Oct 15, 2010, 8:51 pm |
|
Total credits by ex exemplary performanceCS-2009 IDc1: Innovation in Designposted by javier bolanos zeledon on Sep 26, 2010, 3:59 pm
On CS 2.0 How many credits from the 1.1-1.4 can you earn by exemplary performance. I know for v 2009 is three, but I don't know if this is a change between CS2.0 and V2009. Thanks. Last reply: javier bolanos zeledon, Oct 15, 2010, 6:58 pm |