Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EA Pr 2 - Water Heating Equipment

CI-2009 EAp2:Minimum Energy Performance
posted by  Ciaran McCabe  on 

I have a 12kW electric water cylinder and a 12kW direct gas fired water heater.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jan 6, 2016, 3:44 pm

EAc5.1 vs EAc5

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Mohammad Haj-Ali  on 

As I understand having read user comments, although the reference guide emphasizes that electricity is to be measured, other energy sources should also be measured just like M&V for new constru

3
Electrical Design Engineer, LEED AP BD+C, REP
Dar Al-Handasah
LEEDuser Basic Member
0 thumbs up
Wed Jan 6, 2016, 3:10 pm

ASHRAE 90.1 2007 Appendix G System Type 6

NC-2009 EAp2:Minimum Energy Performance
posted by  deborah davidson  on 

We are working on a project which falls under the category of System 6 - Packaged VAV with PFP Boxes for the Baseline Building.

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Jan 6, 2016, 2:46 pm

IEQp1 VRP Calculator

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Vassil Vassilev  on 

Greetings, Regarding IEQp1 and VRP Compliance Calculator there is a question on how to enter an AHU having the following characteristics: The AHU is a constant volume device; supplying to several

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Jan 6, 2016, 6:12 am

2 office floors on a 20 stories building

EBOM-v4 MPR2:Must use reasonable LEED boundaries
posted by  Michael E. Edmonds-Bauer  on 

Hello, We have a cliente that is interested in pursuing LEED for his brand new offices.

4
Tue Jan 5, 2016, 7:23 pm

SSc2 Activity log 20% of the time

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Mary Rose Anlacan  on 

Hi everyone, I need help in documenting SSc2 and SSc3 from the preliminary review comment i received for EB O&M project.I'm not clear what i need to write in a narrative from the below comment

4
Default Avatar
Conserve Consultants Private Limited
LEEDuser Basic Member
5 thumbs up
Tue Jan 5, 2016, 3:26 pm

Shuttle bus

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Karim Farah  on 

“ The project (a private factory) is seeking to fulfill the credit requirement of the credit SS Credit 4.1 – Alternative Transportation – Public Transportation access) .

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Jan 5, 2016, 5:13 am

Option on Survey of Fuel-efficient Carpool /Vanpool?

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Michelle Bracewell-Musson  on 

Hello, I have used a survey that was accepted by GBCI based on the Leeduser Template, however, I feel like it would streamline the process if I gave two additional options in the How You Travelled

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Jan 4, 2016, 9:56 pm

CrowdComfort - Credit IEQc7.2

CI-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Scott Balboni  on 

Hi All, I work for a tech start-up called CrowdComfort and we're looking to potentially partner with the Massachusetts USGBC.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 4, 2016, 7:07 pm

EUROPE: Pre-rinse spray valve 1.6gpm or lower

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Charline SEYTIER  on 

Our project is an office bldg with a Kitchen Restaurant in Europe. We are looking for pre-rinse spray valves of 1.6gpm (6L/min) or lower available in France/Switzerland/Germany...

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Jan 4, 2016, 4:19 pm