Forum quick links
Public Corridors Lack Ventilation
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Ali Stricks on
I’m dealing with a building that generally meets ASHRAE 62.1, however several public corridors are unconditioned and unventilated.
Exhaust in naturally ventilated apartment-style dorms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Michael Wironen on
Hi, We have a tricky situation. We have a dormitory with apartment-style dorms. There is a common living area/kitchenette with four student bedrooms (with private baths) off a common corridor.
Alternative Standard to ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum Energy Performanceposted by Jourdan Younis on
We have a project that consists of two connected buildings: an admin building and a factory building.
Interview Room with 2 seats
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maher Hemod on
what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ? Thanks in advance.
Private bus line for public use?
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Michael Wahjudi on
Hi all, I have received reply from LEED reviewer stating that "campus or private bus line that falls within onequarter mile of the project site must provide transportation service to the public in
indoor irrigation
NC-v4 WEc1:Outdoor water use reductionposted by Francesco Passerini on
Is indoor irrigation not considered in this credit? If it isn't, could I consider it in the section "Innovation", since, in the project I'm considering, collected rainwater is used?
LEED rating system change from CS to NC?
posted by Jeroen Sap on
I am working on a Core&Shell office building project. The owner has not yet found a tenant so we are preparing design documentation for LEED CS.
Recert vs. new Cert
posted by Jessica Hawley on
Reading through this forum I still don't think I see a clear consensus on recert vs. new cert. I have a client who was originally certified in 2011 EBOM and they are up for recertification.
Hydrogen Production
NC-2009 EAc2:On-Site Renewable Energyposted by Kristopher Lashley on
Hi, We are looking to install an on-site hydrogen production station that will produce hydrogen that is then sent to hydrogen charging stations around the project to refuel and run a fleet of hdrog
Walking distance from the barracks
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Jose Dehitta on
Our project is a cafeteria which is inside the military base. All the soldiers walks from their barracks to eat or pick up food at the cafeteria. Can we use Option #2 to get 6 points?