Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Measurement & Verification and PI Form 1

NC-2009 EAc5:Measurement and Verification
posted by  Ivan Romero  on 

I'm still not completely clear on the reporting commitment for energy and water usage data.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Aug 9, 2016, 3:10 pm

Simulate Spatial Daylight Autonomy and Annual Sunlight Exposure

NC-v4 EQc7:Daylight
posted by  Julien Richard  on 

Hello everyone, Could someone tell what software is capable of simulating the sDA and ASE according to IES LM 83 methodology ?

9
Tue Aug 9, 2016, 2:42 pm

energy modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bethany Beers  on 

We have a tenant fit out of a single floor in an 8 story building. The new design is an energy efficient chilled beam system, and the central plant remains unchanged.

7
Tue Aug 9, 2016, 2:21 pm

outside air min ventilation

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

I have modeled outside air identical in both the cases for zones that don't have DCV. But i am unclear about how to model outside air identical in both the cases for zones having DCV.

3
Tue Aug 9, 2016, 1:42 pm

Window Assembly - LBNL vs European Software

NC-2009 EAp2:Minimum Energy Performance
posted by  Martin Meehan  on 

Dear all, Our project recently received the comment below regarding window assembly U-value calculations.

3
Tue Aug 9, 2016, 1:28 pm

G3.1.3.13 in Tab. 1.4

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

I modeled a baseline model with System 7. The reviewers wrote that in Tab. 1.4 insufficient information was provided about the VAV reheat boxes, in particular as for G3.1.3.13.

2
ASHRAE BEMP HBDP - LEED GA, Building Performance Consultant
Zonda
LEEDuser Basic Member
14 thumbs up
Tue Aug 9, 2016, 12:55 pm

Use energy per unit per year to compare?- how to normalize? Case

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  stephen sinkovich  on 

Case 2 Option 2 -We are doing a LEED feasibility study for an existing 40+ year old automotive engine Plant that is being refurbished and upgraded with new process equipment.

2
Director of Sustainability
Iconergy
LEEDuser Basic Member
40 thumbs up
Tue Aug 9, 2016, 11:58 am

Different space types within one project registration?

CS-2009 PIf3:Occupant and Usage Data
posted by  Paul Deinhofer  on 

LEED v2009 C&S Our project consists of seven individual LEED projects on a campus site. Each of these seven projects/buildings has several different uses/space types (e.g.

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Aug 9, 2016, 5:29 am

Material Cost Aggregate, Base, Topsoil (Div. 32 1000, 32 3000)

NC-2009 MRc5:Regional Materials
posted by  Matthew Martin  on 

A Contradiction? (my project is under LEED NC 2009) The LEED 2009 ref. guide is unclear with the inclusions for Div. 31, and 32.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 8, 2016, 9:24 pm

2 buildings but cannot function independently without the other

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Miriam Ramirez Baumgarten  on 

Hi, We have a project that includes a Hangar, with two levels of administrative offices and workshop area in one 250,000sf building.

4
Default Avatar
LEEDuser Premium Member
19 thumbs up
Mon Aug 8, 2016, 6:28 pm