No Permanent Irrigation System
EBOM-2009 WEc3:Water Efficient Landscapingposted by Kevin Sullivan on
Hi we are attempting this credit for one of our existing schools project.The project does not have permanent irrigation system.The landscape area is irrigated manually by the facility staff member
Enhanced Cx - Submittal reviews - HVAC&R only?
NC-v4 EAc1:Enhanced commissioningposted by André Harms on
In reference to the V4 LEED Reference Guide for Building Design and Construction, Enhanced Commissioning section: In the Step-by-Step guidance, “Step 4.
ASHREA 0-2005
NC-v4 EAc1:Enhanced commissioningposted by Amrit Kaur on
Any one knows where I can get the referenced 0-2005 standard? officially its no longer available from ASHREA and superseded by 0-2013. Any idea how different they may be?
Energy Star eligibility for very large Display Monitors
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Harry Flamm on
Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h
Basement Levels in ASHRAE 90.1 Energy Models
CS-2009 EAp2:Minimum Energy Performanceposted by Ciaran McCabe on
Hi, I am modelling a 6 storey office building which also has a basement car park.
Occupants / users of public park
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deborah Lucking on
Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?
Operable Windows & Mechanical Ventilation
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Charalampos Giannikopoulos on
Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated?
Combine options
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Leandro Silva on
We are certifying a Project and we are preparing the documentation for the EQ credit 3.2 Construction Indoor Air Quality Management Plan – Before Occupancy.
Corrective Actions and Sub-metering
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Jatuwat Varodompun on
For the submetering, we can just provide the box that allow the tenant to install the meter, right?
Existing building reconstruction and expansion
NC-2009 EAp2:Minimum Energy Performanceposted by Deborah Lucking on
Questions for the experts: We have a project that will have some floor areas demolished and reconstructed/renovated, and also some new construction (less than 20%). 1.