carpet tile adhesive tabs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Elizabeth Eason on
We have carpet tiles attached to the floor with adhesive tabs at the corners rather than with a fluid adhesive. Are the adhesive tabs to be listed in the adhesives and sealants table?
Green Power Contract through vendor
Retail-NC-v4 EAc7:Green power and carbon offsetsposted by Joanna Ruiz on
I am working with a corporate client, who uses a third party company to seek and procure all their utility contracts.
Authority having Jurisdiction
NC-v4 EAp1:Fundamental commissioning and verificationposted by Pam Lynch on
I just took a LEED GA pratice exam and do not understand the answer to this question: The ‘Authority having Jurisdiction’ is responsible for which of the following? a) Completing the commissioning
Contract through Design Team - conflicting information
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rory Cousino on
I am going to ask a question that is probably been answered before - but I cannot find the simple answer. Can the CXA be contracted through / to the Design Team?
FSC-certified bamboo
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jason Grant on
LEED Interpretation ID# 2535 ruled that, under LEED 2009, FSC-certified bamboo could be counted under both MRc6 (Rapidly Renewable Materials) and MRc7 (FSC Certified Wood).
Definition of "bus line"
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Michael Kennedy on
Our project is on a college campus that is within 0.15 mile of a bus stop. It is served by one bus system. It's a public, not student-only system.
Ceramic Tile not exempted any longer
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Melissa Merryweather on
I've submitted several projects over the past few years, all outside the US where ceramic tile is much more common and will always be locally produced.
Water metering
CI-2009 EAc3:Measurement and Verificationposted by Ciaran McCabe on
Does the cold water feed to tenant spaces need to be metered for this credit. Cold water consumption does not feature in the energy model.
>75% M&V Template Requirement
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Dear all, Our project recently received the comment below which appears to require an Option B or D 'template' to be submitted with our plan if a tenant is to take 75% or more of the building spa
CI or NC?
posted by FRAGKISKOS LEVANTIS on
Dear all, A client of mine is building a convention center and he will be operating it. Core and Shell works have been completed. However they are not well documented.