Forum quick links
Decorative Exterior Lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Saif Abdulameer on
Hi everyone, I am working on a project that has exterior decorative lights such as tree lights, small umbrella lights etc.
Equation2: Monthly harvested rainwater volume. (v4)
NC-v4 WEc1:Outdoor water use reductionposted by deepak cherukumilli on
Reference guide v4 BD+C:Page290: STEP 5: I didnot understand why a 0.15 is used in this equation. Is this for any kind of losses in the rain water storage process.
pilot survey problems
Pilot-Credits EQpc78:Design for active occupantsposted by M Bordeaux on
I have a LEED 2009 project and we are trying to go for a pilot credit - design for active occupants.
New Option - Walking Path
Pilot-Credits EQpc78:Design for active occupantsposted by Garrett Ferguson on
On a LEED-CI project where the interior will be renovated, the project owner encourages walking. A walking path has been provided that overlooks an atrium and is daylit with a skylight.
New Construction - ELODIE Tool
NC-v4 MRc1:Building life-cycle impact reductionposted by Ian McCall on
Hello, I am working in France where we analysis the Life Cycle Impacts of materials using the European standards notably ISO 21930 / EN 15804 & NF P01-010.
Operating energy performance
NC-v4 MRc1:Building life-cycle impact reductionposted by Noriko Nagazumi on
On the FAQ of this page the following is written: How does the LCA consider operating energy?
certified wood credit
NC-2009 MRc7:Certified Woodposted by Shawn Keith on
My project specs have put casework into division 12. Do I have to include these in my calcs for MR C 7?
n/a
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies
Permanent entry way to retail space in a mid-rise multi-family
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Morteza Kasmaei on
This is an eight-story apartment building that is pursuing LEED-NC 2009 and contains future retail spaces in the ground floor.
Pesticides during construction
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Omar Elrawy on
Dear all, During the construction phase, the contractor asked to use pesticides once per week within the building.