Late Enhanced ComissioningNC-2009 EAc3: Enhanced Commissioningposted by Carolina Vergnano on Mar 16, 2011, 12:36 pm
Does exist any time limit between the construction conclusion and the start of enhanced comissioning? Last reply: Chris Ladner, Apr 26, 2011, 8:42 am |
|
DES CommissioningNC-2009 EAc3: Enhanced Commissioningposted by Margaret Montgomery on Mar 24, 2011, 4:03 pm
We're looking at a project where we do meet all the conditions for enhanced... Last reply: Chris Ladner, Apr 26, 2011, 8:37 am |
|
All parking underground but one..CS-2009 SSc7.1: Heat island effect - nonroofposted by Mathilda Jonsson on Mar 17, 2011, 12:09 pm
Hi! Last reply: Mathilda Jonsson, Apr 26, 2011, 1:57 am |
|
LEED-CS v2.0 Title-24 2005 equivalent to ASHRAE 90.1-2004?CS-2009 EAc1: Optimize Energy Performanceposted by Lauren Sparandara on Apr 25, 2011, 2:40 pm
For projects registered under LEED-CS v2.0, is Title-24 2005 deemed equivalent to ASHRAE Standard 90.1-2004 for showing compliance with the EAc1 requirements? Last reply: Marcus Sheffer, Apr 25, 2011, 9:27 pm |
|
Ev (System Efficiency) for Constant Volume 100% Outdoor Air SystNC-2009 IEQp1: Minimum indoor air quality performanceposted by Omer Moltay on Mar 30, 2010, 5:49 pm
Dear All, Looking at the LEED submittal form for this credit I am really confused. Having assumed that this will be very easy with a constant volume system that works only with 100%... Last reply: Roger Chang, Apr 25, 2011, 4:49 pm |
|
HIGHER EDU. PROJECTEBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Benoit Gosselin on Mar 30, 2011, 2:09 pmDavid Posada Integrated Design & LEED Specialist SERA Architects LEEDuser Expert 1980 thumbs up April 25, 2011- 12:26 pm You'll need to consider all workstations, not just the typical office ones. You can see a related discussion over at the NC 2009 EQc6.1 forum topic- there is a comment I posted on March 29, 2011 that describes an approach that would probably apply to your situation. Log in or register to post comments ... Last reply: David Posada, Apr 25, 2011, 12:26 pm |
|
"90% Minimum of building occupants"NC-2009 IEQc6.1: Controllability of systems - lightingposted by Sandra Heiser on Apr 25, 2011, 10:56 am
The requirement reads " Provide individual lighting controls for 90% (minimum) of the building occupants..." Is this based on the... Last reply: Sandra Heiser, Apr 25, 2011, 11:40 am |
|
WE Prerequisite qualification for a minimal CS projectCS-2009 WEp1: Water Use Reductionposted by Tak Louie on Mar 14, 2011, 6:48 pm
Our client is building a Retail center for a large grocer with small satellite retail spaces. The balance of the building is simply a parking garage with an enclosed and tempered elevator lobby.... Last reply: Susann Geithner, Apr 25, 2011, 9:30 am |
|
Average Retail Customers for a Bank & Uploading Cut sheetsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Geoffrey Tomlinson on Mar 1, 2011, 7:35 pm
The project that I am currently working on is a bank that has bathrooms in the lobby for client use and employee bathrooms in the office space behind the lobby. I am trying to figure out the... Last reply: Dan Ackerstein, Apr 25, 2011, 9:25 am |
|
Option 3, approach 2: Random selectionEBOM-2009 SSc4: Alternative Commuting Transportationposted by gwenedd murray on Apr 7, 2011, 2:25 pm
This building is over 300,000 sf and located close to public transportation. Half of the tenants are government agencies. The building manager stated if we send out electronic surveys we will... Last reply: Dan Ackerstein, Apr 25, 2011, 9:20 am |