Best Timing for ASHRAE Audit?
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Nelina Loiselle on
What is the best timing for the ASHRAE Level I walkthrough audit? We have our energy star label already, are working on getting our tracking in place for the other credits.
Core Fixtures Existing, Tenant to Install Additional Fixtures
CI-2009 WEc1:Water Use Reductionposted by Nelina Loiselle on
I have a LEED-CI project in which there is one toilet that is EXISTING in the base building and NOT A PART OF THE SCOPE of the tenant improvement.
Motorcycles parking space
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Rosana Correa on
In our project, some of the parking spaces are specific to motorcycles, with smaller areas than in car's spaces.
Category for IEQ Credit 4.1
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by S D on
I am new to the LEED process. I am having trouble determining which categories the following products fall under for the purpose of IEQ Credit 4.1.
I wonder how I should model a Ventilation system
CS-2009 EAc1:Optimize Energy Performanceposted by Ron Dean on
I wonder how I should model a Ventilation system to comply with Apendix G ASHRAE, it said that my proposed desing shall be consistent with design documens.. This is the description of my system: &g
LEED Boundary for ESA
Schools-2009 SSp2:Environmental Site Assessmentposted by Karen Richards on
If doing a 3,700 sf building in the corner of an existing 18 acre school campus, does the Phase I and possibly Phase II assessment need to be for the entire campus or just the area within the LEED
How to identify third-party certifying bodies?
ND-v2009 GIBc1:Certified green buildingsposted by Shenhao Li on
As subject indicated, how to identify third-part certifying bodies as defined by ISO/IEC 17021.
no composite wood products
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Adam Targowski on
What if the tenant was not installing any composite wood products within his scope of work? Does it mean that he get's this point automaticly or that he is not eligible for that point?
Energy Recovery Units - Baseline and Proposed Design ERUs
NC-2009 EAc1:Optimize Energy Performanceposted by Carlton Ross on
We have an existing facility (bus maintenance garage) which is attempting to be Certified.
Reasonable Site Boundary & Min. Building Area to Site Area Ratio
NC-2009 PIf1:Minimum Program Requirementsposted by Greengrade User on
Schools often cannot afford "choice" sites. We have a school with a 155 acre site, 70% of the site is a wetland.