Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Tenant Lease Agreement Cases:

CS-2009 WEc3:Water Use Reduction
posted by  Diego Escalona  on 

Is possible, for a LEED CS project to apply for the three cases (A, B y C), that are expressed in the appendix 4: Tenant Lease Agreement. I.e.

1
Sun Nov 25, 2012, 12:40 am

Comingled Recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Nate Ritter  on 

If a waste hauler servicing a building is offering comingled recycling off all office waste, including waste items that are non recyclable would the storage space on site still be required.

1
Tue Sep 11, 2012, 4:33 pm

Non-Regularly Occupied Spaces such as Bathrooms and Corridors

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  American University  on 

Unfortunately, I believe bathrooms and corridors have to be included in the IEQc2.2 calculations.

1
Tue Sep 11, 2012, 7:04 pm

HVAC System Type for Cold Storage Room

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear Forum, I have the following issue: For the Certification of a Restaurant, there is an inside area that corresponds to cold storage rooms.

1
Wed Sep 12, 2012, 1:43 pm

Ventilation Openings

CS-2009 IEQp1:Minimum IAQ Performance
posted by  TOMAS URIBE  on 

Hello. We are working on a Core & Shell project, it has retail spaces that consists of two levels each one.

1
Wed Sep 12, 2012, 1:23 am

Default or maximal fixture uses ? flow restrictors ?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Nicolas MOLLE  on 

Hello, I have two questions about this prerequisite: 1st. Are the flow described in the baseline a maximum flow for the project ?

1
Wed Sep 12, 2012, 12:07 pm

Building for a single tenant but with laboratories and offices

LEED Rating System Selection
posted by  Nicolas MOLLE  on 

Hello, We are going to register a project for ALSTOM which contains: Offices, laboratories, restaurant and workshop in a whole building of nearly 30 000 m².

1
Wed Sep 12, 2012, 10:22 am

Showers for SSc4.2

CS-2009 WEp1:Water Use Reduction
posted by  BH .  on 

Hi, I have doubts regarding showers for bicycle racks calculations for WEp1.

1
Wed Sep 12, 2012, 3:53 pm

Plastic waste

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Nicolas MOLLE  on 

Hello, I would like if it's possible to sort plastic waste with other banal (common? I don't know the english word) industrial waste ? Or do we need a specific garbage ?

1
Wed Sep 12, 2012, 9:08 pm

Recycling lbs per day

CS-2009 MRp1:Storage and Collection of Recyclables
posted by  Kevin Short  on 

I am trying to determine how many pounds of recycling waste per day my building will generate. Any specific formula to use? It is a 55,000 sq ft office building.

1
Wed Sep 12, 2012, 7:55 pm