Forum quick links
Are all carpet extractors considered equal?
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Kaeryn Gregory on
My client is a school board and they have recently purchased a dry carpet extraction machine and cleaning product program, the machine is not CRI certified.
IAQ requirement in LEED
EBOM-2009 IEQc1.1:IAQ Best Management Practices—IAQ Management Programposted by gloria cheng on
I'm working on a certification of office building. I have been go through the requirement on IEQ, but I'm not sure if I missed. Did any requirement on measuring some IAQ parameter, for example, PM1
Performance Period over 1 1/2 years ago. Can we still submit?
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by Sandie Sparks on
I currently was contacted by a building owner (Hotel) to finish up the LEED certification.
Buildings users with disabilities
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
Our project has entirely separated bathrooms for people with disabilities with flow and flush fixtures consumption different from the ones of the conventional bathjrooms. How can I estimate the pop
Treated wastewater definition.
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Diaa Madkour on
Hi, working on an office building project, we r pursuing this credit through option 2 : "Treat 50% of wastewater on-site...etc." Through the design Preliminary Review we received a comment stating
PTACs as Proposed system?
NC-2009 EAc1:Optimize Energy Performanceposted by David Mirabile on
We are looking into a design-build project of a hotel where the owner is requiring in-room PTAC units.
Do we need a computer
CI-2009 IEQc7.1:Thermal Comfort—Designposted by Maggie Sarhadi on
Do we need a computer software to calculate the PMV/ for EQ7.1
Open Office Space Requirements
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Sherri von Wolfe on
I am confused about multi-occupancy lighting requirements for arena office spaces. This is a research lab project on a university campus.
Excluding regularly occupied areas
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Alicia Villanueva on
We have some projects in which regularly occupied spaces are designed with no-windows because of client's requirements. These are process areas (a kitchen and a laboratory).
Whole Building LCA as Innovation in Design point?
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Alexandra Ramsden on
Two questions: 1) Is it acceptable to submit this as an ID point, outside of the pilot process?