NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Albert Sagrera on
Hi, If the amount of sealant or adhesive material is very small, also has to count or from some percentage can be neglected? Have to account 100% of sealants and adhesives materials? Thanks.
Building Occupancy for Performance Period
EBOM-2009 EAc1:Optimize Energy Performanceposted by Galen Staengl on
Is there a minimum building occupancy % for the 12 month performance period? I am working on an office tower that has slowly increased it occupancy over the last year.
BDC Material Calculator with values over $1,000,000
NC-2009 MRc5:Regional Materialsposted by Julie Blue on
Has anyone run into an issue with the calculator not showing the "Sustainable Criteria Value ($)" under the Regional Materials for total material values over $1,000,000?
Dormitory and Car/Van Pool Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Andrew Lengel on
We are renovating the interiors of two existing dormitories on a college campus. Per LEED-CI SSc3.3 we fall under Case 2. We are not providing any new parking.
Can Interior vegetated areas in the ground floor be counted?
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Sonia M. Miranda Palacios on
I´m working in a Project in Buenos Aires, Argentina, that is trying to achieve SSc5.1.
New Calculation Spreadsheet
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Yelena Gipsov on
Hello! I am working with the new Supplemental Daylight and Views Calculation Spreadsheet, prescriptive option. There is a column "Glare Control Type for spaces with VLT X WFR > 0.18".
hi
The project we´re working
CS-2009 EAc4:Enhanced Refrigerant Management
posted by Ismael Arroyo on
hi The project we´re working on will be cooled by coolling towers, so the tenants can have cooled water to install their own HVAC system.
Multiple Buildings
posted by Dhanujie Jayapala on
Hi, We are planning to apply LEED NC 2009 for a factory. It basically has the Factory and a facility building adjacent to it. There are other buildings like chreche, WWTP,waste storage area, secur
Baseline HVAC System for laboratory
CS-2009 EAp2:Minimum Energy Performanceposted by Yu Wang on
I am not clear about explanation from ASHRAE 90.1-2007 User’s Manual: 1. For laboratory spaces with a min.
No pesticides used during performance period
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Matthew Macko on
We are currently working on a project that used no pesticides during the performance period.