Hi, We are planning to apply LEED NC 2009 for a factory. It basically has the Factory and a facility building adjacent to it. There are other buildings like chreche, WWTP,waste storage area, security room and possibly a solar farm. I have decide to go with both Factory & facility considering the entirety. Which of these should be considered when calculating the building foot print?
Sustainability Executive
MAS Active Trading Pvt Ltd
LEEDuser Basic Member
6 thumbs up