EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Edward Malesevich on
A project I am currently working on is undergoing an exterior renovation project.
Metering equipment and instruments
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Lourdes Salinas on
We are about to perform the inventory of water flow of the fittings and fixtures in a manufacturing plant. Any recommendations about metering equipment and instruments?
Sample size for air speed measurements
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Peter Locke on
Does anyone have a comment on the number of spaces (% of spaces?) that an air speed sample would need to include?
Doubt about off-site area
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Alicia Villanueva on
Hello, I have a question regarding the off-site area.
Dan,
posted by Emily Catacchio on
I would suggest contacting GBCI directly about any potential loss of documentation. I believe some will be lost, but GBCI will be able to more specifically answer that question.
Major Renovations with Additions
NC-2009 EAc1:Optimize Energy Performanceposted by steven maynard on
EA Credit 1 allows for different percentages of energy performance for "Existing Building Renovations" than for "New Buildings", but there does not appear to be any information in the reference gui
ASHRAE Thermal Comfort Tool version 2
NC-2009 IEQc7.1:Thermal Comfort—Designposted by paul martin on
The ASHRAE Thermal Comfort Tool V2 software is based on ASHRAE 55-2010, but LEED-2009 uses 55-2004.
thermal blocks for open plan offices
NC-2009 EAp2:Minimum Energy Performanceposted by Rosana Correa on
I am modeling an office building which has 2 open-plan offices facing 3 different orientation each.
Accounting for natural, undisturbed vegetation
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Jonathon Bates on
We have a natural creek with undisturbed vegetation growing on both sides as part of our project boundary, and I was wondering if the calculation is the same for plantings on site?
Exhaust System test for pressurized buildings with no exhaust
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alice Cook on
Hi all, We have an existing building built in the early 1900s with three 100% make up air units supplying fresh air with no exhaust.