Forum quick links
Recycling Areas Designation
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Sunayana Jain on
In the floor plan, is it required to document the recycling areas as paper, corrugated cardboard, glass, plastics and metals specifically or just designating as recycled areas in floor plan will be
Recertify- post 5 years?
posted by Chris Munn on
According to the guidance I've seen from LEED, your performance period for recertification is from the time you were certified initially up until the time you submit for for recertification.
Entering "total project space equipment capacity" - LEED form
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Seema Pandya on
In the LEED Online form for option 1 section 1.4: Mechanical System Design Criteria, there is a place for you to enter the total space loads for heating and cooling and another entry that asks for
Paint and coating - underground car park and technical platroom
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Julien Daclin on
Does this credit also apply to paint and coatings located in an underground car park and technical plantrooms?
Commercial Building with Tenant spaces fully submetered
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Energy Spectrum on
I am wondering if a commercial building, where over 90% of the building is submetered tenant space would qualify for this credit.
Least Toxic Pesticide - Essentria IC3 ?
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kimberlee Dobbins on
If a product is represented as a Minimum-Risk pest control product and qualifies for exemption from EPA registration under FIFRA 25b, does that mean it is least toxic for LEED purposes?
Reducing Impervious a requirement or a strategy?
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Lauren Ford on
If we are increasing the total impervious area on the site, but treating the stormwater to reduce the TSS, do we still meet the intent of the credit?
Hotel and counting drop-off spaces
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Lauren Ford on
Hello - we have a hotel project and are attempting Option 1. The question is - we are meeting the zoning requirement for number of spaces, PLUS we have 3 drop-off (15 minute) spaces.
Additional space during the final design appeal
posted by Katherine Ann Resurreccion on
Our CI project is a 4-floor office space located in a 10-floor commercial building. We used the split-review option and are currently working with the Final Design Appeal.
Impervious hardscape area at podium
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Caroline Ma on
Is the impervious hardscape area at podium considered as the non-roof hardscape?