Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Existing Imperviouness

CS-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Markus Henning  on 

My question is. The Guide says choose Case 1 Sites with Existing Imperviousness 50%or less or Case 2 Sites with Existing Imperviousness greater than 50%.

1
Sat Feb 11, 2012, 1:22 am

Baseline Exhaust Fans vs. Proposed ERV

NC-2009 EAp2:Minimum Energy Performance
posted by  Candice Rogers  on 

I am modeling a building that directs all building exhaust through an energy recovery ventilator, including bathroom exhaust.

1
Tue Feb 14, 2012, 3:24 pm

ARI Certification for VRF equipment in LEED-NC 2009

NC-2009 EAp2:Minimum Energy Performance
posted by  Mauricio Ramirez  on 

Talking about a VRF HVAC system. Is it a mandatory requirement that the VRF condenser and evaporative units must be ARI Certified, according with the Standard 90.1-2007?

1
Tue Feb 14, 2012, 3:26 pm

external lighting LPD contribution to percentage energy savings

CS-2009 EAc1:Optimize Energy Performance
posted by  Puteri Shireen Jahnkassim  on 

Hello there What does this mean : Ensure that no credit is taken in the proposed case for lighting reduction on tradable surfaces" Does this mean if the LPD for facade lighting for a designed b

1
Mon Feb 13, 2012, 2:35 pm

LPD for space with higher headroom

NC-2009 EAc1:Optimize Energy Performance
posted by  William Wong  on 

Does anyone know what headroom height are based on when ASHRAE design the LPD for space-by-space method (Table 9.6.1) ?

1
Mon Feb 13, 2012, 2:41 pm

high-rise residential building

LEED Rating System Selection
posted by  Adam Targowski  on 

Can a high-rise residential building be certified under LEED Core&Shell? If yes, what is the minimum amout of stories that the building should have (4 or 7)?

1
Mon Feb 13, 2012, 6:47 pm

LEED HC WEc4.1 - Vacuum Pumps

LEED for Healthcare forum
posted by  Simon Sue  on 

A very specific medical equipment in our project building uses oil-sealed rotary vacuum pump as primary pump and dry vacuum pump as secondary pump.

1
Fri Mar 2, 2012, 1:01 pm

Occupancy Fitness Center

CS-2009 WEp1:Water Use Reduction
posted by  Ralf Lehmann  on 

Has anyone of experience in including a fitness center m to an office building. One of the tenants of our Project will be a fittness center. All fit outs will be done by the tenants.

1
Wed Feb 22, 2012, 1:49 pm

Non-fibrated aluminum paint

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Bruce Maine  on 

This is actually a LEED for Healthcare question dealing with exterior applied products. In several roofing sections we ask for "non-fibrated aluminum paint".

1
Tue Feb 21, 2012, 5:35 am

Office Space With 25% Data Center Changing to 100% Office-June

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Michelle Bracewell-Musson  on 

There are four buildings that are leased by the State and one of the buildings currently has 25% if it as a Data Center.

1
Mon Feb 20, 2012, 6:41 pm