Forum quick links
Applying both Case 1 and Case 2 to our site?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Shannon Terrell on
We have a site that is partially a greenfield and partially previously developed (remediated brownfield).
Please Clarify
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Aliesa Adelman on
Two different bus lines simply refers to two buses on different routes from the same carrier, correct? Or does the credit require two separate carriers servicing stops 1/4 mi. from the project?
South America weather data
NC-2009 EAc1:Optimize Energy Performanceposted by Carlos Alberto Hoyos Soto on
Anyone knows what energy modeling software has developed South America weather data?
CFC-Based Refrigerant Annual Leakage Rate
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jason McIntyre on
I'm hoping for some insight on the annual leakage rate calculation, the reference guides reference to EPA Clean Air Act, Rule 608, and the Refrigerant Management Plan. On page 145 of the reference
Modelling Condenser Efficieny in Baseline for LEED
NC-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
We are modelling a building with water cooled chillers. We are preparing a baseline plant for LEED NC 2009. For the check of necessary plant efficiencies we checked the minimal efficiencies with co
NC v2.2 AGMBC
posted by Michael Asaro on
We have a three building military project under a single application, seeking a one rating. This is allowed according to the 2005 AGMBC.
Using Parking Structure Data for Survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Dawn Brenner on
The building seeking LEED certification is a downtown, high-rise building without feasible street parking. The building has an attached parking structure.
Building footprint vs. hardscape
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Erica Downs on
Would entry stairs to the building be considered part of the building footprint, or part of the site hardscape? Thanks.
Regularly Occupied Spaces
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Paola Figueiredo, Newton Figueiredo on
Hello. I have a typical room in this CI project, that is used in a sporadic period during the day. In this room we have five workstation, but as i said, used about 1 hour per day.
WEp1 compliance
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Roberto Meza on
Hello, I have a project in which the only fixture inside the project scope is a small kitchen sink, of course that it will be water efficient. Shall I fill the LEED Online form with only this in