Unnecessary Permanent Irrigation

Schools-2009 WEc1:Water Efficient Landscaping
posted by  Tim Hoeft  on 

Our landscape designer has assured us that the native plant design will not require irrigation once established.

1
Fri Mar 25, 2011, 8:21 pm

Minumum sight line height in existing building

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Susan Di Giulio  on 

I think I know the answer to this, but it's not the answer I want, so I'll throw it out there: I am working on an extensive remodel of a University dorm.The bottom of the existing rough wall openin

1
Sat Apr 23, 2011, 7:48 pm

registering after construction starts

General forums
posted by  Tristan Roberts  on 

Guillermo, this should not be a problem from what you have said so far.

0

M&V data reporting

NC-2009 EAc5:Measurement and Verification
posted by  Joseph Greene  on 

Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?

1
Fri Mar 18, 2011, 9:40 pm

Option 2: Restrictions?

CI-2009 SSc1:Site Selection
posted by     on 

Our project has a campus designed for 5 buildings. One building and the entire site was built out and received LEED Certified in 2004.

1
Tue Mar 29, 2011, 4:09 am

Biomass Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  sara frye  on 

Our project, a small non-profit farm house renovation, is using a wood fired biomass boiler.

1
Fri Mar 25, 2011, 4:09 pm

SLL Prerequisite 3 HELP!!!

General forums
posted by  Roger Moquin  on 

I have a lot of trouble with that prerequisite. Our project is in Canada and there is water everywhere here!!! First, we have a little water body in border of the road near our project.

1
Thu Apr 7, 2011, 12:38 am

Credit 3.2, Option 1, Path 2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Douglas Blakeslee  on 

We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.

1
Wed Mar 23, 2011, 2:02 pm

Phased IAQ Testing?

Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Q +  on 

Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones.

1
Tue Mar 29, 2011, 4:36 am

IAQ Testing and Furnishings

Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Q +  on 

The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although it

1
Tue Mar 29, 2011, 4:38 am