Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
2
Thu Feb 6, 2025, 4:01 pm
1
Fri Feb 21, 2025, 4:24 pm
1
Fri Feb 21, 2025, 4:13 pm

Regd. monsoon reheat coils used in terminal boxes in a hospital project for dehumidification & defrosting

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Anurag Ghosh  on 

Hi, we have a hospital project following ASHRAE 90.1 2013 and having cooling as the predominant system.

0

Existing envelope

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

We have a project that is a major renovation of an existing building.

3
Sustainability Manager
Conserve Solutions- Riyadh, Kingdom of Saudi Arabia
LEEDuser Basic Member
1 thumbs up
Tue Feb 4, 2025, 3:23 pm

FTE For Stadium

Calculating FTEs
posted by  KHIM BOK TAN  on 

Hi all, 

0

Paint VOC violation

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Summer Gorder  on 

If 100% VOC compliance is required for Paints and Coatings, what does this language mean "To meet the 100% requirement for VOC content evaluation, a VOC budget may be use?"

1
Tue Feb 4, 2025, 4:26 pm
3
Default Avatar
Director of Design Build Division
Dorvin D Leis
LEEDuser Basic Member
1 thumbs up
Mon Feb 3, 2025, 2:01 am

Our project needs some clarification regarding Minimum Indoor Air Quality Performance Calculator.

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Nagaraj Sankar  on 

One of my LEED v4 ID+C project getting below comments from LEED reviewer for Minimum Indoor Air Quality Performance Calculator (Project having AHU with VAV Boxes).

5
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Sat Feb 1, 2025, 9:59 am