Forum quick links
Post-review changes to the performance period
posted by Melissa Young on
We submitted our preliminary application for LEED 2009 EBOM and received a whole list of credits that were approved and pending.
Retaining rainwater for future uses
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Gabriela Hernández Castillo on
Will capturing all rainwater and keep it in a tank for future uses such as cooling towers and irrigation? Our project will not infiltrate it but reuse it instead.
specific mechanical drawings for PI4?
posted by Erica Downs on
Does anyone know specifically which "mechanical" drawings GBCI is looking for here? We have 26 drawings just for mechanical (not including electrical or plumbing).
Remnant Limestone- any LEED credit there?
CS-2009 MRc3:Materials Reuseposted by Julie Hendricks on
My client wants to use remnant limestone (basically pieces of limestone left over when larger pieces are cut) for exterior siding.
Occupancy Sensor
CI-2009 EAp2:Minimum Energy Performanceposted by Simon Sue on
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).
EAPr2 - Lighting Control (shut-off control and space control)
CI-2009 EAp2:Minimum Energy Performanceposted by Ramesh Narayanan on
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p
Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions
NC-2009 EAp2:Minimum Energy Performanceposted by Vindio Corro on
We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha