Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Daylighting in Residential Building

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Omer Moltay  on 

Dear All, What are the requirements of daylighting in a residential building? Specifically: (1) Are bedrooms included in the calculations?

1
Thu Feb 16, 2012, 10:25 pm

VOC questions: Testing method and translation

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Mauricio Ramirez  on 

I have a product from a large paint corporation, that has manufacturer information that supports the VOC content in g/L.

1
Wed Feb 22, 2012, 4:22 am

contact GBCI

General forums
posted by  Tristan Roberts  on 

Nicolas, if you contact GBCI via GBCI.org, they should be able to help you with this.

0

Innovation - Double Transit Ridership

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Alicia Freire  on 

My understanding was that the only way to achieve this credit was to develop a Comprehensive Transportation Management Plan; however, the form also shows the following option: “Double Transit Ride

1
Sat Feb 18, 2012, 2:30 am

Licensed professional exemption / uploads for SSp1

Living with LEED Online - quirks, bugs and hiccups
posted by  Maura Adams  on 

I had a civil engineer try to approve SSp1, Construction Activity Pollution Prevention using his LPE. He went to the credit's LPE page and clicked the box and nothing happened.

1
Fri Feb 17, 2012, 5:49 pm

Diffuser Workstation Alignment

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Leah Samson-Samuel  on 

We are working on a project where the owner/architect has elected to satisfy the requirements of this credit with overhead diffusers controlled by remote controls placed in individual workstation c

1
Fri Feb 17, 2012, 6:10 pm

Sidewalks and all-weather access

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Dave Barg  on 

I currently have a project on a military base that was denied this point because "not all of the listed services have sidewalk pedestrian access from the project site....dirt trails do not meet the

1
Fri Apr 6, 2012, 2:22 pm

EBOM WEc4 Cooling Tower Water Management as C&Sv2009 ID Credit

CS-2009 IDc1:Innovation in Design
posted by  Liz Voeller  on 

The LEED Project Submittal Tips guide for C&S from GBCI (published 12/23/2011) states that EBOM WEc4.1 Cooling Tower Water Management is allowed in BD&C v2009 as an ID credit.

1
Wed Feb 22, 2012, 4:18 am

Arduino and CO2 Sensor

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Francisco Sanchez Arroyo  on 

We are pursuing IEQc1 and we would like to use CO2 sensors connected to an Open Source Arduino micro controller in order to manage the alarms, interface with other systems and publish to Pachube (h

1
Mon Feb 27, 2012, 9:55 pm

LEEP AP,

CI-2009 IDc2:LEED Accredited Professional
posted by  Cyril Knabe-Nicol  on 

Hello, everyone, I just wanted to have clarification regarding the LEED AP, if we have in the design team or in the team undertaking the Assessment someone who is a LEED AP.

1
Tue Feb 21, 2012, 5:34 am