Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE 90.1 Add G table G3.1 baseline

CS-2009 EAc1:Optimize energy performance
posted by  charles bell  on 

We have a building which is six stories. The first floor is retail, second thru fifth is office and sixth is residential. All are served from a virtual central plant.

1
Thu Nov 8, 2012, 7:10 pm

EAC2 in a Positive Energy Building

NC-2009 EAc2:On-site renewable energy
posted by  Milena Rafols Salvador  on 

We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.

1
Thu Nov 8, 2012, 7:15 pm

EAc5 Exemplary Performance

NC-2009 EAc5:Measurement and verification
posted by  Jodie Clarke  on 

The guidance for exemplary performance specifies the NC, CS and Schools rating systems. I would like to get credit for following Option 2 and 3 for Healthcare.

1
Thu Nov 8, 2012, 10:46 pm

Retail FTEFull-time

CS-2009 WEp1:Water use reduction
posted by  James Wieben  on 

Retail FTE is for 8 hour shifts, so if the business has 12 hours open to the public do I use a value of 1.5 x the FTE value to arrive at a value to use when defining the usage of the plumbing fixtu

1
Sun Nov 25, 2012, 12:38 am

LEED for Home Multi-Family

Pilot-Credits PC38:Advanced Utility Tracking
posted by  Nate Gapinski  on 

Has anyone ever certified a multi-family construction project? Just wanted to see how the process was and if we are on top of everything.

1
Sun Nov 11, 2012, 7:02 pm

Accessibility for Seniors

Pilot-Credits PC34:Design for Adaptability
posted by  Lance Hillegas  on 

Our project is an age and income restricted apartment building for low income seniors.

0

Which rating system to use.

LEED Rating System Selection
posted by  Sheryl Swartzle  on 

We are working on a large airport project. West terminal is registered in LEED NC v2.2 (construction not started as of yet).

1
Fri Nov 23, 2012, 3:26 pm

Outdoor Air Intake: Baseline vs. Proposed

NC-2009 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

We are currently working on a LEED project whose Baseline Building will have an HVAC system 5 installed.

1
Mon Nov 12, 2012, 2:46 pm

Distance between bicycle storage and building entrance

CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Patricia Missawa  on 

According to LEED Commercial Interiors SSc3.2 - Alternative Transportation: Bicycle storage and changing rooms template, if a bicycle storage is located within the building, the distance must be co

1
Tue Nov 20, 2012, 1:58 am

To meter or not to meter

CI-2009 EAc3:Measurement and verification
posted by  Rudolph Carneiro  on 

I have a store (case 1) with a small 60 ton chiller, 2 AHU's, lighting, and plug loads. If HVAC, plug loads, and lighting can be measured on one meter, how many meters do I need?

1
Mon Nov 26, 2012, 4:45 pm