Doubt

CS-2009 EAp2:Minimum Energy Performance
posted by  Redy Truccolo  on 

Hi, I'm doing a LEED CS 2009 PRE-certification. My question is: In the "Upload L-4" section, which states: Provide a detailed narrative describing the intended credit approach, including energy ef

1
Wed Oct 26, 2011, 7:24 pm

Re:Regional Priority Credit

General forums
posted by  David Posada  on 

I had to look for it, too - In the v3 LEEDOnline scorecard, the fourth column is labeled "RP" at the top and a magnifying glass icon appears next to the regional priority credits based on the zip c

1
Wed Sep 14, 2011, 6:49 pm

View outside vision glazing, LEED CI 2.0 project.

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Rubén M. R.  on 

Hi all, Since I couldn't find a LEED CI 2.0 forum, I allow myself to write here (my apologies): The vision of a multi-occupant office goes directly to a terrace which has a high wall located 10

1
Mon Nov 21, 2011, 3:54 am

Min Airflow in Intermittent Occupancy Spaces

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Rick Servoss  on 

We received a comment back on a CI project stating: "Demonstrate the system serving the special occupancy space is capable of modulating system and zone minimum supply volume below 0.30 cubic feet

1
Wed Nov 23, 2011, 3:55 pm

IP Credit: Discovery

General forums
posted by  Mark Campbell  on 

This credit is a very good addition. A lot of LEED projects today aren't doing these types of studies and they are very valuable. Consider associating a time frame for this credit.

0

IP Credit: Implementing Synergies

General forums
posted by  Mark Campbell  on 

This credit should be required to be documented in fundamental commissioning Basis of Design document.

0

EA Credit: Optimize Energy Performance

General forums
posted by  Mark Campbell  on 

Add a process chart to explain the simulations that have to be performed, the time they have to be performed in design, and if they can be used to satisfy IPc1 - Discovery.

0

PF: Fundamental Commissioning & Verification

General forums
posted by  Mark Campbell  on 

The layout of commissioning is based around design-bid-build model and not an integrative design or design-build delivery. This creates either a loophole or exception for achieving the prereq.

0

PF Credit: Enhanced Commissioning

General forums
posted by  Mark Campbell  on 

Review contractor submittals and witness training should be in fundamental commissioning, then enhanced focuses on O&M and ongoing.

0

LEED 2012 Comments

General forums
posted by  Jeff Chapman  on 

SS Prerequisite: Construction Activity Pollution Prevention: I would like to see a picture requirement to prove this plan was in place. SS Credit: Site Assessment : I am assuming that if this is

0