Forum quick links
Applicable standard?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Veronika Sundberg on
Have anyone used another reference other than the ASHRAE standard 62 for a hospital project. The rooms in our hospital are not compliant with the standard rooms of table 6.1.
What consitutes a suffient interior fit-out
posted by Maria Lopez on
I am having troubles understanding the definition of complete interior fit-out to determine whether our office renovation is eligible for LEED CI certification.
Operable windows as controls
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Amanda Ross on
Just to clarify: Each operable window counts as one control.
ID credit for 100% outside air
NC-2009 IEQc2:Increased Ventilationposted by Nelina Loiselle on
I know there is not an exemplary performance for this credit per say, but I am working on a project where we will using 100% outside air...do you think we could attmept an ID point since we are goi
Strand Woven Bamboo
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Kenneth Bailey on
Our project will use considerable amount of strand woven bamboo. .
Building Renovation
CS-2009 EAp2:Minimum Energy Performanceposted by Morteza Kasmaei on
Advanced Energy Modeling for LEED states "Existing buildings with less than 50% renovation should not be rotated,...". How can one calculates renovation percentage of an existing building?
Temporary Structure Phase 1A question for ESC...
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Rick Alfandre on
We have a project that has multiple phases, the first of which is just a the erection of a temporary retail facility.
Multiple Buildings, different sites. Sharing underground
posted by Nicolas Carbone on
Hi there. I would like to have a recomendation on how to register three different projects that are being built together in the same construction site.
non default occupancy numbers
NC-2009 IEQp1:Minimum IAQ Performanceposted by Veronika Sundberg on
We want to use non default occupancy values for some rooms in our project. Do anyone have experience what the reviewers might have for thoughts regarding this.
What can we claim?
NC-2009 IDc1:Innovation in Designposted by Clare Parry on
Hi all, We have just received our Construction Prelim results and comments.