Forum quick links
Zone air distribution ventilation effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Maria Kutelova on
I need help with determining proper case for the Air Distribution Configuration per table per Table 6-2. The forth entry required a velocity of 150 cfm to be reached within 4.5 ft of floor levels.
AGMBC for a Campus Wide Study
posted by Mei Zhu on
We are doing a study on a university campus which has had a few LEED certified projects in the past.
Option 1 Path 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by shaun Andriano on
Hello. We have a building looking to meet the requirements for Option 1 Path 2. In the credit language it states that the flush is to stop at the end of occupancy for that day.
Documenting VOC content in products
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Petra Hajná on
Hi everybody... again. Does anybody know if manufacturers' letters are accepted as proper documents to proof VOC levels?
Unable to receive the Energy Star Rating
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Dorilee Torres on
Hello, I am involved in a Medical Device facility that is pursuing LEED evaluation. It was built and operates since three years ago outside the US.
EAp2/EAc1 Renovation Vs. New construction
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Beccia on
We are modeling a classroom building. The building is 55% renovated, and 45% new construction. We are renovating the major HVAC systems, exterior envelope, and building interior.
validity of a LEED 2009 registration
posted by Melissa Merryweather on
I've been working for the past year on a suite of 3 NC projects for a client, all to be registered with LEED 2009 in the next month or so, and I've just been asked if there will be a limit to the v
Development density - just touches a building
NC-2009 SSc2:Development Density and Community Connectivityposted by Lawrence Lile on
My development density radius just touches a 92,000 square foot hotel, which will kick me over the 60,000 sq ft per acre limit.
Construction Impact Zone
posted by Sam Watters on
Hello, I am making the map of our anticpated construction impact zone, and I am wondering about development that is taking place outside of our LEED Boundary.
Specific measurement system required?
posted by Mauricio Ramirez on
I have projects in Mexico that are measured in metric plans. All my calculations have been done in imperial units, as if it's required by LEED.